Pembroke
PMBWalesManaged by TfW Rail
How this station is performing
Pembroke had 5,962 scheduled stops to Period 7 of 2026-27, about 16 a day. 74.4% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Pembroke opened on 1 August 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Johnston (Pembs) is the oldest (1856) and Pembroke Dock the newest (1864), with Pembroke in between.
The nearest stations to Pembroke are Lamphey (2.4 km east), Pembroke Dock (3.2 km north-west), Manorbier (8.0 km east), Milford Haven (10.5 km north-west) and Johnston (Pembs) (11.1 km north-west). 3 stations lie within 10 km in all. At 74.4%, Pembroke is less punctual than all of them; the best of the five, Milford Haven, manages 80.9%.
Pembroke takes its name from a town called Pembroke, home to about 7,966 people, and the station stands 0.7 km from its centre.
For Pembroke, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 62.4% of stops arrived within three minutes of the timetable. The strongest was Period 10 of 2023-24, at 88.6%, which is 26.2 percentage points higher. Cancellations peaked at 11.6% of scheduled stops in Period 10 of 2024-25, against 4.1% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Pembroke on 74.4%. The comparison group includes Manorbier (76.6%), Pembroke Dock (79.9%) and Kilgetty (58.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,894 | 74.7% | 4.0% |
| Great Western Railway | 68 | – | – |
Operators with their own page for this station are linked to it.
Late train at Pembroke? Delay Repay
These operators call at Pembroke and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 82.8% | 3.2% |
| Period 6 of 2026-27 | 490 | 78.0% | 1.4% |
| Period 5 of 2026-27 | 482 | 73.1% | 5.0% |
| Period 4 of 2026-27 | 482 | 67.7% | 5.4% |
| Period 3 of 2026-27 | 480 | 73.8% | 3.5% |
| Period 2 of 2026-27 | 470 | 67.6% | 5.1% |
| Period 1 of 2026-27 | 531 | 71.9% | 3.2% |
| Period 13 of 2025-26 | 416 | 75.2% | 2.6% |
| Period 12 of 2025-26 | 464 | 83.6% | 1.9% |
| Period 11 of 2025-26 | 426 | 83.3% | 2.6% |
| Period 10 of 2025-26 | 419 | 71.3% | 5.7% |
| Period 9 of 2025-26 | 450 | 62.4% | 5.1% |
| Period 8 of 2025-26 | 388 | 74.3% | 9.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Manorbier | 5,962 | 76.6% | 4.1% |
| Pembroke Dock | 5,962 | 79.9% | 4.1% |
| Kilgetty | 5,963 | 58.5% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out