Pembroke Dock
PMDWalesManaged by TfW Rail
How this station is performing
Pembroke Dock had 5,962 scheduled stops to Period 7 of 2026-27, about 16 a day. 79.9% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Pembroke Dock opened on 12 August 1864, 162 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pembroke Dock is the newest; the oldest, Johnston (Pembs), opened in 1856.
The nearest stations to Pembroke Dock are Pembroke (3.2 km south-east), Lamphey (5.3 km south-east), Milford Haven (7.6 km west), Johnston (Pembs) (8.0 km north-west) and Manorbier (10.7 km east). 4 stations lie within 10 km in all. Of the five, Milford Haven is the most punctual at 80.9% and Pembroke the least at 74.4%, with Pembroke Dock on 79.9%.
Pembroke Dock takes its name from a town called Pembroke Dock, home to about 9,753 people, and the station stands 0.2 km from its centre.
For Pembroke Dock, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 69.1% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2023-24, at 92.6%, which is 23.5 percentage points higher. Cancellations peaked at 11.6% of scheduled stops in Period 10 of 2024-25, against 4.1% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Pembroke Dock is the most punctual, at 79.9%. The comparison group includes Manorbier (76.6%), Pembroke (74.4%) and Kilgetty (58.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,894 | 79.9% | 4.0% |
| Great Western Railway | 68 | – | – |
Operators with their own page for this station are linked to it.
Late train at Pembroke Dock? Delay Repay
These operators call at Pembroke Dock and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 81.5% | 3.2% |
| Period 6 of 2026-27 | 490 | 78.1% | 1.4% |
| Period 5 of 2026-27 | 482 | 74.2% | 5.0% |
| Period 4 of 2026-27 | 482 | 70.6% | 5.4% |
| Period 3 of 2026-27 | 480 | 75.2% | 3.5% |
| Period 2 of 2026-27 | 470 | 77.4% | 5.1% |
| Period 1 of 2026-27 | 531 | 82.7% | 3.2% |
| Period 13 of 2025-26 | 416 | 85.2% | 2.6% |
| Period 12 of 2025-26 | 464 | 90.1% | 1.9% |
| Period 11 of 2025-26 | 426 | 90.8% | 2.6% |
| Period 10 of 2025-26 | 419 | 84.6% | 5.7% |
| Period 9 of 2025-26 | 450 | 69.1% | 5.1% |
| Period 8 of 2025-26 | 388 | 80.7% | 9.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out