How this station is performing
Peartree had 1,872 scheduled stops to Period 7 of 2026-27, about 5 a day. 74.3% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Peartree opened on 2 June 1890 and closed to passengers on 4 March 1968. It reopened on 4 October 1976, 50 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Peartree is the newest; the oldest, Derby, opened in 1839.
The nearest stations to Peartree are Derby (2.2 km north), Spondon (4.4 km east), Willington (7.9 km south-west), Duffield (10.1 km north) and Long Eaton (12.5 km east). 3 stations lie within 10 km in all. Of the five, Duffield is the most punctual at 82.9% and Derby the least at 69.2%, with Peartree on 74.3%.
Peartree has slipped sharply. 74.3% of stops came within three minutes of the timetable in the latest 13 periods, 7.7 percentage points worse than the 82.0% recorded in the 13 before. Cancellations rose to 2.9% of scheduled stops from 2.1%, which is 0.8 percentage points more.
Compared with 3 stations of a similar size in East Midlands, Peartree is the least punctual, at 74.3%. All of them are ahead, including Rauceby (76.0%), Ancaster (75.3%) and Netherfield (78.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 1,872 | 74.3% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Peartree? Delay Repay
These operators call at Peartree and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 136 | 71.2% | 2.9% |
| Period 6 of 2026-27 | 136 | 66.7% | 2.9% |
| Period 5 of 2026-27 | 136 | 70.3% | 5.9% |
| Period 4 of 2026-27 | 128 | 72.4% | 0.8% |
| Period 3 of 2026-27 | 136 | 71.5% | 4.4% |
| Period 2 of 2026-27 | 136 | 76.7% | 5.1% |
| Period 1 of 2026-27 | 158 | 85.0% | 3.2% |
| Period 13 of 2025-26 | 148 | 78.3% | 3.4% |
| Period 12 of 2025-26 | 136 | 70.6% | 0.0% |
| Period 11 of 2025-26 | 128 | 72.4% | 3.9% |
| Period 10 of 2025-26 | 134 | 72.2% | 0.7% |
| Period 9 of 2025-26 | 180 | 76.6% | 5.0% |
| Period 8 of 2025-26 | 180 | 77.8% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rauceby | 2,331 | 76.0% | 1.9% |
| Ancaster | 2,909 | 75.3% | 1.9% |
| Netherfield | 3,134 | 78.9% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out