Netherfield
NETEast MidlandsManaged by East Midlands Railway
How this station is performing
Netherfield had 3,134 scheduled stops to Period 7 of 2026-27, about 9 a day. 78.9% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
The nearest stations to Netherfield are Carlton (0.4 km north), Radcliffe (Nottinghamshire) (3.2 km south-east), Burton Joyce (3.5 km north-east), Nottingham (4.7 km west) and Lowdham (7.4 km north-east). 8 stations lie within 10 km in all. Of the five, Lowdham is the most punctual at 83.9% and Radcliffe (Nottinghamshire) the least at 75.0%, with Netherfield on 78.9%.
Netherfield is one of 2 stations named after a town called Netherfield, home to about 7,398 people; this one stands 0.3 km from its centre.
Netherfield has slipped sharply. 78.9% of stops came within three minutes of the timetable in the latest 13 periods, 8.6 percentage points worse than the 87.5% recorded in the 13 before. Cancellations fell to 2.0% of scheduled stops from 2.5%, which is 0.5 percentage points fewer.
For Netherfield, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 41.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2025-26, at 92.4%, which is 50.5 percentage points higher. Cancellations peaked at 6.0% of scheduled stops in Period 8 of 2023-24, against 2.0% over the latest 13 periods.
Compared with 3 stations of a similar size in East Midlands, Netherfield is the most punctual, at 78.9%. The comparison group includes Ancaster (75.3%), Rauceby (76.0%) and Willington (72.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 3,134 | 78.9% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Netherfield? Delay Repay
These operators call at Netherfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 251 | 73.7% | 1.6% |
| Period 6 of 2026-27 | 252 | 41.9% | 1.6% |
| Period 5 of 2026-27 | 252 | 70.9% | 3.2% |
| Period 4 of 2026-27 | 252 | 81.9% | 1.2% |
| Period 3 of 2026-27 | 251 | 78.2% | 4.0% |
| Period 2 of 2026-27 | 240 | 83.3% | 2.5% |
| Period 1 of 2026-27 | 263 | 88.9% | 0.4% |
| Period 13 of 2025-26 | 250 | 90.4% | 3.6% |
| Period 12 of 2025-26 | 228 | 83.3% | 0.4% |
| Period 11 of 2025-26 | 225 | 89.1% | 1.8% |
| Period 10 of 2025-26 | 211 | 85.0% | 1.9% |
| Period 9 of 2025-26 | 227 | 79.8% | 1.8% |
| Period 8 of 2025-26 | 232 | 81.5% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ancaster | 2,909 | 75.3% | 1.9% |
| Rauceby | 2,331 | 76.0% | 1.9% |
| Willington | 5,178 | 72.2% | 6.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out