Parkstone (Dorset)
PKSSouth WestManaged by South Western Railway
How this station is performing
Parkstone (Dorset) had 26,948 scheduled stops to Period 7 of 2026-27, about 74 a day. 74.0% of recorded arrivals were within three minutes of the timetable and 5.4% of scheduled stops were cancelled.
Parkstone (Dorset) opened on 15 June 1874, 152 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hamworthy is the oldest (1847) and Branksome the newest (1893), with Parkstone (Dorset) in between.
The nearest stations to Parkstone (Dorset) are Branksome (2.1 km east), Poole (2.6 km west), Hamworthy (5.0 km west), Bournemouth (5.9 km east) and Pokesdown (8.6 km east). 6 stations lie within 10 km in all. Of the five, Branksome is the most punctual at 74.5% and Bournemouth the least at 69.7%, with Parkstone (Dorset) on 74.0%.
Parkstone (Dorset) is named after Parkstone, a suburb, home to about 10,779 people, but the station stands 1.4 km from its centre.
Across the whole run of data, the weakest four-week period for Parkstone (Dorset) was Period 9 of 2024-25, at 58.5%, some time before the latest year. The strongest was Period 1 of 2025-26, at 86.2%, and the two are 27.7 percentage points apart. Cancellations peaked at 11.4% of scheduled stops in Period 9 of 2023-24, against 5.4% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Parkstone (Dorset) is the least punctual, at 74.0%. All of them are ahead, including Branksome (74.5%), Paignton (86.5%) and Torquay (82.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 26,948 | 74.0% | 5.4% |
Operators with their own page for this station are linked to it.
Late train at Parkstone (Dorset)? Delay Repay
These operators call at Parkstone (Dorset) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,988 | 70.3% | 4.6% |
| Period 6 of 2026-27 | 2,081 | 80.9% | 1.9% |
| Period 5 of 2026-27 | 2,101 | 70.4% | 6.0% |
| Period 4 of 2026-27 | 2,075 | 63.5% | 7.6% |
| Period 3 of 2026-27 | 1,947 | 73.1% | 6.9% |
| Period 2 of 2026-27 | 2,093 | 69.1% | 8.4% |
| Period 1 of 2026-27 | 2,432 | 82.7% | 3.2% |
| Period 13 of 2025-26 | 2,326 | 79.0% | 4.5% |
| Period 12 of 2025-26 | 2,101 | 78.7% | 5.3% |
| Period 11 of 2025-26 | 2,102 | 78.5% | 6.1% |
| Period 10 of 2025-26 | 1,833 | 78.0% | 4.8% |
| Period 9 of 2025-26 | 1,972 | 68.3% | 5.3% |
| Period 8 of 2025-26 | 1,897 | 66.0% | 6.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out