Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Par

All trains at ParCrossCountry across BritainSouth West

On time, last 13 periods56.6%Whole station: 69.4%
Cancelled10.7%Whole station: 6.2%
Scheduled stops1,333Of 29,258 at the station

How this operator is doing here

CrossCountry had 1,333 scheduled stops at Par in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 56.6% of recorded arrivals came within three minutes and 10.7% of stops were cancelled.

CrossCountry trains at Par also serve St Austell (6.3 km west, 59.5% on time, 12.2% cancelled), Lostwithiel (6.3 km north-east, 57.1% on time, 11.5% cancelled), Bodmin Parkway (10.4 km north, 58.9% on time, 11.7% cancelled), Liskeard (19.5 km north-east, 55.3% on time, 11.6% cancelled), Truro (27.5 km west, 56.4% on time, 12.9% cancelled) and Redruth (39.5 km west, 58.9% on time, 14.1% cancelled), which are the stations on its network closest to Par.

The busiest CrossCountry station within 30 km of Par is St Austell, 6.3 km west, with about 4 scheduled stops a day.

Of the 2 operators with enough records at Par, CrossCountry is the least punctual, at 56.6%.

For CrossCountry, Par is the 85th best of 99 ranked stations. Its 56.6% here is 6.6 percentage points below the 63.2% across the whole network.

CrossCountry cancels more at Par than elsewhere: 10.7% of scheduled stops, against 5.9% across its network and 6.2% for every operator at the station.

Alongside CrossCountry, the other operators at Par are Great Western Railway (69.9%, 95% of stops), so passengers here can compare several services.

Period by period

40%60%80%2023-242024-252025-262026-27Period 3 of 2025-26: 65.3%Period 4 of 2025-26: 61.4%Period 5 of 2025-26: 50.0%Period 6 of 2025-26: 56.8%Period 7 of 2025-26: 73.3%Period 8 of 2025-26: 60.4%Period 9 of 2025-26: 63.4%Period 10 of 2025-26: 57.5%Period 11 of 2025-26: 66.7%Period 12 of 2025-26: 69.1%Period 13 of 2025-26: 72.8%Period 1 of 2026-27: 63.1%Period 2 of 2026-27: 49.5%Period 3 of 2026-27: 47.8%Period 4 of 2026-27: 32.3%Period 5 of 2026-27: 41.3%Period 6 of 2026-27: 50.0%Period 7 of 2026-27: 61.7%
This pageGreat Britain
0%10%20%30%Period 3 of 2025-26: 12.0%Period 4 of 2025-26: 5.6%Period 5 of 2025-26: 13.0%Period 6 of 2025-26: 5.0%Period 7 of 2025-26: 2.8%Period 8 of 2025-26: 7.7%Period 9 of 2025-26: 16.5%Period 10 of 2025-26: 18.9%Period 11 of 2025-26: 22.0%Period 12 of 2025-26: 3.0%Period 13 of 2025-26: 5.5%Period 1 of 2026-27: 4.3%Period 2 of 2026-27: 8.7%Period 3 of 2026-27: 4.2%Period 4 of 2026-27: 13.9%Period 5 of 2026-27: 12.4%Period 6 of 2026-27: 11.1%Period 7 of 2026-27: 13.0%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2710861.7%13.0%
Period 6 of 2026-2710850.0%11.1%
Period 5 of 2026-2710541.3%12.4%
Period 4 of 2026-2710832.3%13.9%
Period 3 of 2026-279647.8%4.2%
Period 2 of 2026-2710449.5%8.7%
Period 1 of 2026-2711663.1%4.3%
Period 13 of 2025-2610972.8%5.5%
Period 12 of 2025-2610069.1%3.0%
Period 11 of 2025-2610066.7%22.0%
Period 10 of 2025-269057.5%18.9%
Period 9 of 2025-268563.4%16.5%
Period 8 of 2025-2610460.4%7.7%

Other operators at Par

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway27,92569.9%6.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out