Pantyffynnon
PTFWalesManaged by TfW Rail
How this station is performing
Pantyffynnon had 3,646 scheduled stops to Period 7 of 2026-27, about 10 a day. 73.1% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Pantyffynnon opened on 24 January 1857, 169 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pantyffynnon is the newest; the oldest, Ammanford, opened in 1841.
The nearest stations to Pantyffynnon are Ammanford (1.9 km north), Llandybie (4.7 km north), Pontarddulais (7.6 km south-west), Ffairfach (10.5 km north) and Llangennech (11.3 km south-west). 3 stations lie within 10 km in all.
Pantyffynnon takes its name from a Village called Pantyffynnon, and the station stands 0.1 km from its centre.
Pantyffynnon improved sharply over the past year. In the latest 13 periods 73.1% of stops came within three minutes of the timetable, up 7.6 percentage points from 65.5% in the 13 before. Cancellations rose to 4.9% of scheduled stops from 3.7%, which is 1.2 percentage points more.
2 of 3 stations of a similar size in Wales are more punctual than Pantyffynnon on 73.1%. The comparison group includes Bynea (70.0%), Llandeilo (80.7%) and Llandovery (77.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 3,646 | 73.1% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Pantyffynnon? Delay Repay
These operators call at Pantyffynnon and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 276 | 72.2% | 2.2% |
| Period 6 of 2026-27 | 298 | 72.5% | 2.3% |
| Period 5 of 2026-27 | 289 | 66.8% | 6.2% |
| Period 4 of 2026-27 | 290 | 63.4% | 11.4% |
| Period 3 of 2026-27 | 296 | 79.3% | 7.1% |
| Period 2 of 2026-27 | 296 | 71.3% | 2.4% |
| Period 1 of 2026-27 | 342 | 78.0% | 4.4% |
| Period 13 of 2025-26 | 322 | 73.0% | 0.9% |
| Period 12 of 2025-26 | 279 | 79.2% | 1.8% |
| Period 11 of 2025-26 | 256 | 72.7% | 7.0% |
| Period 10 of 2025-26 | 233 | 81.3% | 12.9% |
| Period 9 of 2025-26 | 230 | 69.6% | 1.3% |
| Period 8 of 2025-26 | 239 | 71.1% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bynea | 3,646 | 70.0% | 5.0% |
| Llandeilo | 3,646 | 80.7% | 4.8% |
| Llandovery | 3,646 | 77.8% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out