Bynea
BYEWalesManaged by TfW Rail
How this station is performing
Bynea had 3,646 scheduled stops to Period 7 of 2026-27, about 10 a day. 70.0% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
Bynea opened on 1 May 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bynea is the oldest; the next oldest, Llangennech, dates from 1850.
The nearest stations to Bynea are Llangennech (2.5 km north-east), Llanelli (4.3 km west), Gowerton (5.1 km south-east), Pontarddulais (6.2 km north-east) and Pembrey and Burry Port (10.4 km west). 4 stations lie within 10 km in all. Of the five, Pembrey and Burry Port is the most punctual at 70.6% and Gowerton the least at 69.0%, with Bynea on 70.0%.
Bynea takes its name from a Village called Bynea, and the station stands 0.6 km from its centre.
Bynea improved sharply over the past year. In the latest 13 periods 70.0% of stops came within three minutes of the timetable, up 9.1 percentage points from 60.9% in the 13 before. Cancellations rose to 5.0% of scheduled stops from 3.6%, which is 1.4 percentage points more.
Compared with 3 stations of a similar size in Wales, Bynea is the least punctual, at 70.0%. All of them are ahead, including Llandeilo (80.7%), Llandovery (77.8%) and Pantyffynnon (73.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 3,646 | 70.0% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Bynea? Delay Repay
These operators call at Bynea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 276 | 76.3% | 2.5% |
| Period 6 of 2026-27 | 298 | 75.4% | 2.7% |
| Period 5 of 2026-27 | 289 | 64.9% | 6.2% |
| Period 4 of 2026-27 | 290 | 66.9% | 11.0% |
| Period 3 of 2026-27 | 296 | 78.5% | 7.1% |
| Period 2 of 2026-27 | 296 | 69.8% | 2.4% |
| Period 1 of 2026-27 | 342 | 74.5% | 4.4% |
| Period 13 of 2025-26 | 322 | 69.3% | 0.9% |
| Period 12 of 2025-26 | 279 | 73.1% | 1.8% |
| Period 11 of 2025-26 | 256 | 68.5% | 7.0% |
| Period 10 of 2025-26 | 233 | 75.0% | 13.7% |
| Period 9 of 2025-26 | 230 | 55.8% | 1.3% |
| Period 8 of 2025-26 | 239 | 57.5% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llandeilo | 3,646 | 80.7% | 4.8% |
| Llandovery | 3,646 | 77.8% | 5.0% |
| Pantyffynnon | 3,646 | 73.1% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out