CrossCountry at Paignton
How this operator is doing here
CrossCountry had 1,811 scheduled stops at Paignton in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 74.1% of recorded arrivals came within three minutes and 21.8% of stops were cancelled.
CrossCountry trains at Paignton also serve Torquay (3.3 km north-east, 70.0% on time, 21.8% cancelled), Totnes (8.8 km west, 69.0% on time, 7.5% cancelled), Newton Abbot (10.9 km north, 66.8% on time, 8.9% cancelled), Teignmouth (13.5 km north, 55.4% on time, 17.2% cancelled), Dawlish (17.7 km north-east, 52.2% on time, 17.3% cancelled) and Dawlish Warren (20.1 km north-east, – on time, – cancelled), which are the stations on its network closest to Paignton.
The busiest CrossCountry station within 30 km of Paignton is Newton Abbot, 10.9 km north, with about 33 scheduled stops a day.
Of the 2 operators with enough records at Paignton, CrossCountry is the least punctual, at 74.1%.
CrossCountry at Paignton has slipped a little, from 78.9% within three minutes in the previous 13 periods to 74.1% in the latest 13, a fall of 4.8 percentage points. Cancellations rose to 21.8% of scheduled stops from 12.6%, which is 9.2 percentage points more.
Over three full railway years CrossCountry at Paignton has got worse each time, from 81.6% within three minutes in 2023-24 to 80.0% in 2024-25 and 77.0% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 129 | 73.9% | 28.7% |
| Period 6 of 2026-27 | 156 | 72.9% | 17.3% |
| Period 5 of 2026-27 | 137 | 65.7% | 48.9% |
| Period 4 of 2026-27 | 144 | 69.0% | 21.5% |
| Period 3 of 2026-27 | 139 | 72.3% | 14.4% |
| Period 2 of 2026-27 | 152 | 73.0% | 17.1% |
| Period 1 of 2026-27 | 158 | 76.7% | 7.6% |
| Period 13 of 2025-26 | 115 | 72.0% | 7.0% |
| Period 12 of 2025-26 | 105 | 83.8% | 5.7% |
| Period 11 of 2025-26 | 147 | 77.3% | 25.2% |
| Period 10 of 2025-26 | 126 | 74.4% | 31.7% |
| Period 9 of 2025-26 | 156 | 74.7% | 36.5% |
| Period 8 of 2025-26 | 147 | 75.8% | 18.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Paignton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 25,113 | 87.3% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out