Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

South Western Railway at Overton

All trains at OvertonSouth Western Railway across BritainSouth East

On time, last 13 periods81.6%Whole station: 81.6%
Cancelled2.2%Whole station: 2.2%
Scheduled stops15,700Of 15,701 at the station

How this operator is doing here

South Western Railway had 15,700 scheduled stops at Overton in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 81.6% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.

South Western Railway trains at Overton also serve Whitchurch (Hampshire) (5.8 km west, 80.6% on time, 2.2% cancelled), Micheldever (8.0 km south, 65.6% on time, 2.5% cancelled), Basingstoke (12.0 km east, 72.6% on time, 2.5% cancelled), Andover (16.9 km west, 74.8% on time, 2.5% cancelled), Hook (20.9 km east, 87.8% on time, 2.5% cancelled) and Winchester (21.2 km south, 67.8% on time, 3.7% cancelled), which are the stations on its network closest to Overton.

Within 30 km of here, South Western Railway runs best at Hook, 20.9 km east (87.8%), and worst at Micheldever, 8.0 km south (65.6%).

The busiest South Western Railway station within 30 km of Overton is Basingstoke, 12.0 km east, with about 208 scheduled stops a day.

Of the 1 operators with enough records at Overton, South Western Railway is the most punctual, at 81.6%.

South Western Railway at Overton has slipped a little, from 84.4% within three minutes in the previous 13 periods to 81.6% in the latest 13, a fall of 2.8 percentage points. Cancellations held steady at 2.2% of scheduled stops, against 2.1% before.

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 89.3%Period 2 of 2023-24: 89.5%Period 3 of 2023-24: 90.3%Period 4 of 2023-24: 88.2%Period 5 of 2023-24: 89.9%Period 6 of 2023-24: 90.2%Period 7 of 2023-24: 81.8%Period 8 of 2023-24: 78.1%Period 9 of 2023-24: 76.6%Period 10 of 2023-24: 84.5%Period 11 of 2023-24: 87.3%Period 12 of 2023-24: 90.6%Period 13 of 2023-24: 89.5%Period 1 of 2024-25: 89.8%Period 2 of 2024-25: 90.0%Period 3 of 2024-25: 84.1%Period 4 of 2024-25: 84.1%Period 5 of 2024-25: 86.1%Period 6 of 2024-25: 88.4%Period 7 of 2024-25: 79.6%Period 8 of 2024-25: 80.1%Period 9 of 2024-25: 67.0%Period 10 of 2024-25: 80.9%Period 11 of 2024-25: 85.8%Period 12 of 2024-25: 87.5%Period 13 of 2024-25: 91.7%Period 1 of 2025-26: 90.9%Period 2 of 2025-26: 88.3%Period 3 of 2025-26: 85.6%Period 4 of 2025-26: 80.9%Period 5 of 2025-26: 82.2%Period 6 of 2025-26: 86.9%Period 7 of 2025-26: 88.8%Period 8 of 2025-26: 82.1%Period 9 of 2025-26: 77.6%Period 10 of 2025-26: 82.2%Period 11 of 2025-26: 83.6%Period 12 of 2025-26: 89.5%Period 13 of 2025-26: 87.4%Period 1 of 2026-27: 86.2%Period 2 of 2026-27: 77.3%Period 3 of 2026-27: 83.8%Period 4 of 2026-27: 72.3%Period 5 of 2026-27: 74.2%Period 6 of 2026-27: 81.7%Period 7 of 2026-27: 80.5%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 9.6%Period 2 of 2023-24: 2.4%Period 3 of 2023-24: 1.1%Period 4 of 2023-24: 0.4%Period 5 of 2023-24: 3.3%Period 6 of 2023-24: 1.4%Period 7 of 2023-24: 1.3%Period 8 of 2023-24: 1.0%Period 9 of 2023-24: 5.3%Period 10 of 2023-24: 3.8%Period 11 of 2023-24: 1.1%Period 12 of 2023-24: 1.1%Period 13 of 2023-24: 2.0%Period 1 of 2024-25: 5.4%Period 2 of 2024-25: 1.9%Period 3 of 2024-25: 1.2%Period 4 of 2024-25: 1.6%Period 5 of 2024-25: 1.5%Period 6 of 2024-25: 2.4%Period 7 of 2024-25: 1.8%Period 8 of 2024-25: 1.8%Period 9 of 2024-25: 4.6%Period 10 of 2024-25: 3.1%Period 11 of 2024-25: 1.8%Period 12 of 2024-25: 1.0%Period 13 of 2024-25: 1.5%Period 1 of 2025-26: 0.5%Period 2 of 2025-26: 0.4%Period 3 of 2025-26: 2.4%Period 4 of 2025-26: 2.7%Period 5 of 2025-26: 3.9%Period 6 of 2025-26: 1.6%Period 7 of 2025-26: 1.7%Period 8 of 2025-26: 1.1%Period 9 of 2025-26: 1.2%Period 10 of 2025-26: 1.7%Period 11 of 2025-26: 1.7%Period 12 of 2025-26: 1.3%Period 13 of 2025-26: 1.2%Period 1 of 2026-27: 2.1%Period 2 of 2026-27: 4.1%Period 3 of 2026-27: 2.5%Period 4 of 2026-27: 3.4%Period 5 of 2026-27: 5.2%Period 6 of 2026-27: 1.3%Period 7 of 2026-27: 1.5%2023-242024-252025-262026-27

See how South Western Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,22380.5%1.5%
Period 6 of 2026-271,21081.7%1.3%
Period 5 of 2026-271,22074.2%5.2%
Period 4 of 2026-271,16572.3%3.4%
Period 3 of 2026-271,18183.8%2.5%
Period 2 of 2026-271,17877.3%4.1%
Period 1 of 2026-271,36286.2%2.1%
Period 13 of 2025-261,31587.4%1.2%
Period 12 of 2025-261,22289.5%1.3%
Period 11 of 2025-261,18383.6%1.7%
Period 10 of 2025-261,06582.2%1.7%
Period 9 of 2025-261,22677.6%1.2%
Period 8 of 2025-261,15082.1%1.1%

Time of year

70%80%90%P1: 88.9%1P2: 86.6%2P3: 85.8%3P4: 81.6%4P5: 83.1%5P6: 86.7%6P7: 82.8%7P8: 80.1%8P9: 73.8%9P10: 82.5%10P11: 85.5%11P12: 89.1%12P13: 89.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Overton

OperatorScheduled stopsWithin 3 minCancelled
CrossCountry1––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out