Overpool
OVENorth WestManaged by Merseyrail
How this station is performing
Overpool has usable figures for 1 of the last 13 four-week periods to Period 7 of 2026-27, covering 25,904 scheduled stops, about 71 a day. In those periods 97.9% of stops arrived within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Overpool opened on 15 August 1988, 38 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hooton is the oldest (1840) and Eastham Rake the newest (1995), with Overpool in between.
The nearest stations to Overpool are Little Sutton (1.2 km west), Ellesmere Port (2.0 km east), Capenhurst (2.9 km south-west), Hooton (3.7 km west) and Eastham Rake (4.6 km north-west). 19 stations lie within 10 km in all. At 97.9%, Overpool is more punctual than every one of them; the best of the five, Ellesmere Port, manages 93.8%.
Overpool takes its name from a Village called Overpool, and the station stands 0.9 km from its centre.
Merseyrail is the only operator serving Overpool. Here it manages 97.9% within three minutes, 6.4 percentage points better than its 91.5% across its whole network.
Overpool recorded about 233,562 entries and exits in 2025-26, ranking 1344th nationally. That is roughly 9 passengers for every scheduled stop.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 25,904 | 97.9% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Overpool? Delay Repay
These operators call at Overpool and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,960 | – | 1.4% |
| Period 6 of 2026-27 | 1,980 | – | 3.1% |
| Period 5 of 2026-27 | 1,980 | – | 1.7% |
| Period 4 of 2026-27 | 1,843 | – | 1.0% |
| Period 3 of 2026-27 | 1,980 | – | 1.8% |
| Period 2 of 2026-27 | 1,980 | – | 0.6% |
| Period 1 of 2026-27 | 2,265 | – | 0.5% |
| Period 13 of 2025-26 | 2,186 | – | 1.1% |
| Period 12 of 2025-26 | 1,980 | 97.9% | 1.6% |
| Period 11 of 2025-26 | 1,980 | – | 4.5% |
| Period 10 of 2025-26 | 1,787 | – | 1.5% |
| Period 9 of 2025-26 | 1,959 | – | 1.7% |
| Period 8 of 2025-26 | 2,024 | – | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out