Southeastern at Otford
How this operator is doing here
Southeastern had 31,919 scheduled stops at Otford in the 13 periods to Period 7 of 2026-27, 55% of the station's total. 80.3% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
Southeastern trains at Otford also serve Shoreham (Kent) (2.2 km north, 97.1% on time, 0.0% cancelled), Dunton Green (2.6 km south-west, 81.6% on time, 1.4% cancelled), Kemsing (3.9 km south-east, 81.0% on time, 1.3% cancelled), Sevenoaks (4.2 km south, 72.3% on time, 1.6% cancelled), Eynsford (5.5 km north, 94.3% on time, 0.0% cancelled) and Knockholt (5.9 km north-west, 81.0% on time, 1.4% cancelled), which are the stations on its network closest to Otford.
Within 30 km of here, Southeastern runs best at Sundridge Park, 16.6 km north-west (99.4%), and worst at Hildenborough, 11.1 km south (70.3%).
The busiest Southeastern station within 30 km of Otford is London Bridge, 29.0 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Otford, Southeastern is the least punctual, at 80.3%.
For Southeastern, Otford is the 117th best of 173 ranked stations. Its 80.3% here is 3.9 percentage points below the 84.2% across the whole network.
Over three full railway years Southeastern at Otford has got worse each time, from 84.7% within three minutes in 2023-24 to 82.7% in 2024-25 and 82.0% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,553 | 72.0% | 1.2% |
| Period 6 of 2026-27 | 2,533 | 73.2% | 1.3% |
| Period 5 of 2026-27 | 2,609 | 82.2% | 2.2% |
| Period 4 of 2026-27 | 2,586 | 85.0% | 1.4% |
| Period 3 of 2026-27 | 2,531 | 81.6% | 3.0% |
| Period 2 of 2026-27 | 2,465 | 81.5% | 0.9% |
| Period 1 of 2026-27 | 2,746 | 87.0% | 0.4% |
| Period 13 of 2025-26 | 2,626 | 84.4% | 0.8% |
| Period 12 of 2025-26 | 2,428 | 83.5% | 0.8% |
| Period 11 of 2025-26 | 2,419 | 81.3% | 1.2% |
| Period 10 of 2025-26 | 1,876 | 81.4% | 1.0% |
| Period 9 of 2025-26 | 2,277 | 74.4% | 1.2% |
| Period 8 of 2025-26 | 2,270 | 75.3% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Otford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,932 | 91.3% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out