How this operator is doing here
GTR had 33,669 scheduled stops at Ore in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 80.8% of recorded arrivals came within three minutes and 9.2% of stops were cancelled.
GTR trains at Ore also serve Hastings (1.4 km south-west, 79.3% on time, 6.3% cancelled), St Leonards Warrior Square (2.5 km south-west, – on time, 5.0% cancelled), Three Oaks (4.1 km north, 79.0% on time, 3.8% cancelled), Doleham (5.9 km north, – on time, 3.5% cancelled), Bexhill (8.6 km west, 82.7% on time, 4.5% cancelled) and Collington (9.9 km west, 83.0% on time, 4.9% cancelled), which are the stations on its network closest to Ore.
Within 30 km of here, GTR runs best at Winchelsea, 10.8 km north-east (88.5%), and worst at Pevensey and Westham, 19.5 km west (76.6%).
The busiest GTR station within 30 km of Ore is Hampden Park (Sussex), 23.3 km west, with about 177 scheduled stops a day.
GTR at Ore has slipped a little, from 84.8% within three minutes in the previous 13 periods to 80.8% in the latest 13, a fall of 4.0 percentage points. Cancellations rose to 9.2% of scheduled stops from 6.7%, which is 2.5 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,698 | 69.2% | 15.6% |
| Period 6 of 2026-27 | 2,709 | 53.3% | 22.0% |
| Period 5 of 2026-27 | 2,468 | 72.9% | 10.2% |
| Period 4 of 2026-27 | 2,633 | 83.7% | 7.4% |
| Period 3 of 2026-27 | 2,680 | 84.9% | 11.4% |
| Period 2 of 2026-27 | 2,559 | 83.0% | 11.8% |
| Period 1 of 2026-27 | 2,891 | 87.2% | 7.4% |
| Period 13 of 2025-26 | 2,742 | 88.6% | 6.1% |
| Period 12 of 2025-26 | 2,490 | 86.5% | 4.0% |
| Period 11 of 2025-26 | 2,728 | 87.2% | 4.7% |
| Period 10 of 2025-26 | 2,458 | 84.2% | 5.9% |
| Period 9 of 2025-26 | 2,661 | 80.6% | 6.1% |
| Period 8 of 2025-26 | 1,952 | 82.6% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ore
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 245 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out