How this operator is doing here
West Midlands Railway had 12,815 scheduled stops at Oakengates in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 76.5% of recorded arrivals came within three minutes and 3.9% of stops were cancelled.
West Midlands Railway trains at Oakengates also serve Telford Central (1.5 km south-east, 75.9% on time, 3.7% cancelled), Wellington (Shropshire) (4.6 km west, 78.8% on time, 3.9% cancelled), Shifnal (6.1 km south-east, 75.7% on time, 3.7% cancelled), Cosford (11.4 km south-east, 77.4% on time, 3.9% cancelled), Albrighton (13.7 km south-east, 75.0% on time, 3.9% cancelled) and Codsall (18.3 km south-east, 72.8% on time, 3.9% cancelled), which are the stations on its network closest to Oakengates.
Within 30 km of here, West Midlands Railway runs best at Cannock, 28.8 km east (94.0%), and worst at Penkridge, 22.5 km east (57.1%).
The busiest West Midlands Railway station within 30 km of Oakengates is Wolverhampton, 25.1 km south-east, with about 183 scheduled stops a day.
West Midlands Railway at Oakengates has slipped sharply. 76.5% of stops came within three minutes of the timetable in the latest 13 periods, 5.4 percentage points worse than the 81.9% recorded in the 13 before. Cancellations fell to 3.9% of scheduled stops from 6.0%, which is 2.1 percentage points fewer.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,004 | 75.4% | 2.0% |
| Period 6 of 2026-27 | 1,004 | 76.6% | 2.9% |
| Period 5 of 2026-27 | 987 | 70.6% | 4.1% |
| Period 4 of 2026-27 | 923 | 65.2% | 4.7% |
| Period 3 of 2026-27 | 1,008 | 75.0% | 1.6% |
| Period 2 of 2026-27 | 925 | 76.3% | 12.3% |
| Period 1 of 2026-27 | 1,087 | 81.2% | 2.6% |
| Period 13 of 2025-26 | 1,068 | 82.4% | 3.6% |
| Period 12 of 2025-26 | 938 | 85.3% | 2.1% |
| Period 11 of 2025-26 | 957 | 84.6% | 6.5% |
| Period 10 of 2025-26 | 913 | 80.3% | 2.5% |
| Period 9 of 2025-26 | 1,004 | 68.6% | 1.6% |
| Period 8 of 2025-26 | 997 | 73.1% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Oakengates
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 514 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out