Nutbourne
NUTSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Nutbourne had 15,501 scheduled stops to Period 7 of 2026-27, about 43 a day. 74.6% of recorded arrivals were within three minutes of the timetable and 6.1% of scheduled stops were cancelled.
Nutbourne opened on 1 April 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bosham is the oldest (1847) and Warblington the newest (1907), with Nutbourne in between.
The nearest stations to Nutbourne are Southbourne (1.7 km west), Bosham (2.6 km east), Emsworth (3.9 km west), Fishbourne (Sussex) (4.8 km east) and Warblington (5.9 km west). 9 stations lie within 10 km in all. Of the five, Emsworth is the most punctual at 76.7% and Bosham the least at 71.6%, with Nutbourne on 74.6%.
Nutbourne is one of 2 stations named after a Village called Nutbourne; this one stands 0.4 km from its centre.
For Nutbourne, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 62.7% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 85.4%, which is 22.7 percentage points higher.
Compared with 3 stations of a similar size in South East, Nutbourne is the least punctual, at 74.6%. All of them are ahead, including Minster (82.4%), Walmer (78.1%) and Grateley (81.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 15,501 | 74.6% | 6.1% |
Operators with their own page for this station are linked to it.
Late train at Nutbourne? Delay Repay
These operators call at Nutbourne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,247 | 68.5% | 4.9% |
| Period 6 of 2026-27 | 769 | 62.7% | 8.1% |
| Period 5 of 2026-27 | 1,205 | 66.7% | 8.5% |
| Period 4 of 2026-27 | 1,205 | 73.7% | 6.8% |
| Period 3 of 2026-27 | 1,152 | 74.8% | 8.0% |
| Period 2 of 2026-27 | 1,329 | 78.5% | 9.1% |
| Period 1 of 2026-27 | 1,396 | 83.0% | 3.9% |
| Period 13 of 2025-26 | 1,393 | 83.8% | 5.5% |
| Period 12 of 2025-26 | 1,133 | 79.4% | 4.0% |
| Period 11 of 2025-26 | 1,212 | 77.5% | 5.5% |
| Period 10 of 2025-26 | 1,050 | 71.3% | 5.4% |
| Period 9 of 2025-26 | 1,207 | 67.9% | 4.0% |
| Period 8 of 2025-26 | 1,203 | 73.9% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out