Southeastern at Northfleet
All trains at NorthfleetSoutheastern across BritainSouth East
How this operator is doing here
Southeastern had 27,253 scheduled stops at Northfleet in the 13 periods to Period 7 of 2026-27, 52% of the station's total. 86.5% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Southeastern trains at Northfleet also serve Ebbsfleet International (0.4 km south-west, 81.2% on time, 1.7% cancelled), Swanscombe (0.9 km west, 86.1% on time, 1.8% cancelled), Gravesend (3.0 km east, 81.4% on time, 3.0% cancelled), Greenhithe for Bluewater (3.1 km west, 82.0% on time, 3.0% cancelled), Stone Crossing (4.2 km west, 86.6% on time, 1.8% cancelled) and Longfield (5.8 km south, 78.6% on time, 2.0% cancelled), which are the stations on its network closest to Northfleet.
Within 30 km of here, Southeastern runs best at Sundridge Park, 21.3 km west (99.4%), and worst at Newington, 25.9 km south-east (69.0%).
The busiest Southeastern station within 30 km of Northfleet is London Bridge, 29.1 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Northfleet, Southeastern is the most punctual, at 86.5%.
For Southeastern, Northfleet is the 61st best of 173 ranked stations. Its 86.5% here is 2.3 percentage points above the 84.2% across the whole network.
Southeastern at Northfleet has edged up: 86.5% of stops came within three minutes of the timetable in the latest 13 periods, 2.3 percentage points better than the 84.2% of the 13 before. Cancellations fell to 1.9% of scheduled stops from 3.0%, which is 1.1 percentage points fewer.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,172 | 87.2% | 1.4% |
| Period 6 of 2026-27 | 2,106 | 86.0% | 2.1% |
| Period 5 of 2026-27 | 2,213 | 85.4% | 2.6% |
| Period 4 of 2026-27 | 2,102 | 89.3% | 1.9% |
| Period 3 of 2026-27 | 2,171 | 83.6% | 3.5% |
| Period 2 of 2026-27 | 2,132 | 84.4% | 3.4% |
| Period 1 of 2026-27 | 2,424 | 90.7% | 2.0% |
| Period 13 of 2025-26 | 2,266 | 87.7% | 1.5% |
| Period 12 of 2025-26 | 1,358 | 84.3% | 0.8% |
| Period 11 of 2025-26 | 2,115 | 86.8% | 1.7% |
| Period 10 of 2025-26 | 1,960 | 89.7% | 1.0% |
| Period 9 of 2025-26 | 2,061 | 83.1% | 1.8% |
| Period 8 of 2025-26 | 2,173 | 84.5% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Northfleet
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,652 | 83.2% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out