Transport for Wales at Newport (South Wales)
All trains at Newport (South Wales)Transport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 40,968 scheduled stops at Newport (South Wales) in the 13 periods to Period 7 of 2026-27, 44% of the station's total. 77.1% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
Transport for Wales trains at Newport (South Wales) also serve Pye Corner (2.9 km west, 88.2% on time, 3.8% cancelled), Rogerstone (4.6 km west, 87.1% on time, 3.8% cancelled), Risca and Pontymister (6.6 km west, 87.3% on time, 3.9% cancelled), Cwmbran (7.7 km north, 68.2% on time, 3.1% cancelled), Crosskeys (9.4 km west, 86.9% on time, 3.9% cancelled) and Pontypool and New Inn (12.1 km north, 73.0% on time, 3.3% cancelled), which are the stations on its network closest to Newport (South Wales).
Within 30 km of here, Transport for Wales runs best at Pentre-Bach, 29.2 km north-west (97.2%), and worst at Abergavenny, 25.4 km north (66.9%).
The busiest Transport for Wales station within 30 km of Newport (South Wales) is Cardiff Central, 17.7 km south-west, with about 533 scheduled stops a day.
Of the 3 operators with enough records at Newport (South Wales), Transport for Wales is the most punctual, at 77.1%.
Over three full railway years Transport for Wales at Newport (South Wales) has improved each time, from 66.7% within three minutes in 2023-24 to 76.5% in 2024-25 and 78.9% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,192 | 73.7% | 1.4% |
| Period 6 of 2026-27 | 3,031 | 73.1% | 3.2% |
| Period 5 of 2026-27 | 2,954 | 68.8% | 7.5% |
| Period 4 of 2026-27 | 2,845 | 72.0% | 6.8% |
| Period 3 of 2026-27 | 3,137 | 78.8% | 2.0% |
| Period 2 of 2026-27 | 3,179 | 78.8% | 4.1% |
| Period 1 of 2026-27 | 3,646 | 82.0% | 3.8% |
| Period 13 of 2025-26 | 3,518 | 82.3% | 1.5% |
| Period 12 of 2025-26 | 3,169 | 83.5% | 2.0% |
| Period 11 of 2025-26 | 3,092 | 84.5% | 3.5% |
| Period 10 of 2025-26 | 2,894 | 76.5% | 1.8% |
| Period 9 of 2025-26 | 3,136 | 68.6% | 5.0% |
| Period 8 of 2025-26 | 3,175 | 76.8% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Newport (South Wales)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 41,771 | 66.4% | 3.8% |
| CrossCountry | 10,735 | 72.1% | 15.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out