Great Western Railway at Newport (South Wales)
All trains at Newport (South Wales)Great Western Railway across BritainWales
How this operator is doing here
Great Western Railway had 41,771 scheduled stops at Newport (South Wales) in the 13 periods to Period 7 of 2026-27, 45% of the station's total. 66.4% of recorded arrivals came within three minutes and 3.8% of stops were cancelled.
Great Western Railway trains at Newport (South Wales) also serve Severn Tunnel Junction (15.4 km east, 74.4% on time, 3.9% cancelled), Cardiff Central (17.7 km south-west, 67.7% on time, 3.9% cancelled), St Andrews Road (22.7 km east, 78.6% on time, 4.0% cancelled), Avonmouth (23.1 km south-east, 74.6% on time, 4.2% cancelled), Severn Beach (23.5 km east, 79.1% on time, 4.0% cancelled) and Portway Park and Ride (24.4 km south-east, 68.7% on time, 3.9% cancelled), which are the stations on its network closest to Newport (South Wales).
Within 30 km of here, Great Western Railway runs best at Severn Beach, 23.5 km east (79.1%), and worst at Cardiff Central, 17.7 km south-west (67.7%).
The busiest Great Western Railway station within 30 km of Newport (South Wales) is Cardiff Central, 17.7 km south-west, with about 115 scheduled stops a day.
Of the 3 operators with enough records at Newport (South Wales), Great Western Railway is the least punctual, at 66.4%.
Over three full railway years Great Western Railway at Newport (South Wales) has improved each time, from 60.4% within three minutes in 2023-24 to 65.7% in 2024-25 and 69.7% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,352 | 60.9% | 2.5% |
| Period 6 of 2026-27 | 3,370 | 60.0% | 4.7% |
| Period 5 of 2026-27 | 2,995 | 51.1% | 7.4% |
| Period 4 of 2026-27 | 2,967 | 64.2% | 4.2% |
| Period 3 of 2026-27 | 2,612 | 65.1% | 7.5% |
| Period 2 of 2026-27 | 2,721 | 70.4% | 2.0% |
| Period 1 of 2026-27 | 3,887 | 72.4% | 3.3% |
| Period 13 of 2025-26 | 3,582 | 73.8% | 1.5% |
| Period 12 of 2025-26 | 3,334 | 76.4% | 1.5% |
| Period 11 of 2025-26 | 3,275 | 73.8% | 2.8% |
| Period 10 of 2025-26 | 2,906 | 65.7% | 4.1% |
| Period 9 of 2025-26 | 3,408 | 58.5% | 6.2% |
| Period 8 of 2025-26 | 3,362 | 66.5% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Newport (South Wales)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 40,968 | 77.1% | 3.4% |
| CrossCountry | 10,735 | 72.1% | 15.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out