Northern at New Pudsey
All trains at New PudseyNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 51,400 scheduled stops at New Pudsey in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 70.9% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
Northern trains at New Pudsey also serve Bramley (West Yorkshire) (2.8 km east, 71.3% on time, 3.1% cancelled), Kirkstall Forge (4.2 km north-east, 85.1% on time, 1.0% cancelled), Apperley Bridge (4.5 km north-west, 89.7% on time, 1.0% cancelled), Bradford Interchange (4.8 km west, 69.9% on time, 3.3% cancelled), Bradford Forster Square (4.8 km west, 93.3% on time, 1.3% cancelled) and Horsforth (5.8 km north-east, 77.8% on time, 3.0% cancelled), which are the stations on its network closest to New Pudsey.
Within 30 km of here, Northern runs best at Bradford Forster Square, 4.8 km west (93.3%), and worst at Sowerby Bridge, 18.4 km south-west (58.5%).
The busiest Northern station within 30 km of New Pudsey is Leeds, 8.7 km east, with about 780 scheduled stops a day.
Of the 1 operators with enough records at New Pudsey, Northern is the most punctual, at 70.9%.
For Northern, New Pudsey is the 424th best of 493 ranked stations. Its 70.9% here is 7.7 percentage points below the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,910 | 69.5% | 1.9% |
| Period 6 of 2026-27 | 3,884 | 72.8% | 3.0% |
| Period 5 of 2026-27 | 3,930 | 72.8% | 2.6% |
| Period 4 of 2026-27 | 3,870 | 73.4% | 3.6% |
| Period 3 of 2026-27 | 4,100 | 70.0% | 2.3% |
| Period 2 of 2026-27 | 3,917 | 66.9% | 3.2% |
| Period 1 of 2026-27 | 4,480 | 78.4% | 3.3% |
| Period 13 of 2025-26 | 4,321 | 77.6% | 2.4% |
| Period 12 of 2025-26 | 3,908 | 72.1% | 3.5% |
| Period 11 of 2025-26 | 3,907 | 73.0% | 3.1% |
| Period 10 of 2025-26 | 3,572 | 72.4% | 4.7% |
| Period 9 of 2025-26 | 3,823 | 57.5% | 5.3% |
| Period 8 of 2025-26 | 3,778 | 63.4% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out