Southeastern at New Cross
How this operator is doing here
Southeastern had 73,232 scheduled stops at New Cross in the 13 periods to Period 7 of 2026-27, 59% of the station's total. 90.1% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
Southeastern trains at New Cross also serve Deptford (0.5 km north-east, 88.0% on time, 1.9% cancelled), St Johns (London) (1.1 km south-east, 91.9% on time, 1.5% cancelled), Greenwich (1.2 km east, 89.5% on time, 1.8% cancelled), Nunhead (1.7 km south-west, 86.1% on time, 2.2% cancelled), Lewisham (1.8 km south-east, 87.0% on time, 1.5% cancelled) and Crofton Park (2.4 km south, 83.4% on time, 2.8% cancelled), which are the stations on its network closest to New Cross.
Within 30 km of here, Southeastern runs best at Sundridge Park, 7.9 km south-east (99.4%), and worst at Sevenoaks, 26.8 km south-east (72.3%).
The busiest Southeastern station within 30 km of New Cross is London Bridge, 4.8 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at New Cross, Southeastern is the least punctual, at 90.1%.
For Southeastern, New Cross is the 39th best of 173 ranked stations. Its 90.1% here is 5.9 percentage points above the 84.2% across the whole network.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,345 | 90.5% | 1.0% |
| Period 6 of 2026-27 | 5,776 | 90.1% | 1.0% |
| Period 5 of 2026-27 | 6,423 | 90.9% | 2.1% |
| Period 4 of 2026-27 | 5,679 | 89.8% | 1.4% |
| Period 3 of 2026-27 | 5,704 | 88.0% | 3.7% |
| Period 2 of 2026-27 | 4,927 | 90.4% | 2.3% |
| Period 1 of 2026-27 | 6,320 | 91.5% | 1.0% |
| Period 13 of 2025-26 | 6,149 | 90.5% | 1.5% |
| Period 12 of 2025-26 | 5,751 | 90.9% | 1.1% |
| Period 11 of 2025-26 | 5,404 | 91.4% | 0.9% |
| Period 10 of 2025-26 | 4,308 | 91.1% | 1.2% |
| Period 9 of 2025-26 | 5,748 | 87.5% | 1.3% |
| Period 8 of 2025-26 | 5,698 | 89.3% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at New Cross
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,055 | 93.3% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out