Nelson
NELNorth WestManaged by Northern Trains
How this station is performing
Nelson has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 11,880 scheduled stops, about 33 a day. In those periods 82.3% of stops arrived within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Nelson opened on 1 February 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Colne is the oldest (1848) and Burnley Manchester Road the newest (1986), with Nelson in between.
The nearest stations to Nelson are Brierfield (1.8 km south-west), Colne (3.1 km north-east), Burnley Central (4.9 km south-west), Burnley Barracks (5.6 km south-west) and Burnley Manchester Road (6.0 km south). 7 stations lie within 10 km in all. Of the five, Colne is the most punctual at 84.7% and Burnley Manchester Road the least at 71.5%, with Nelson on 82.3%.
Nelson is one of 2 stations named after a town called Nelson, home to about 33,488 people; this one stands 0.2 km from its centre.
2 of 3 stations of a similar size in North West are more punctual than Nelson on 82.3%. The comparison group includes Brierfield (79.4%), Colne (84.7%) and Burnley Central (82.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,880 | 82.3% | 4.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 912 | 81.5% | 3.5% |
| Period 6 of 2026-27 | 924 | 88.2% | 1.7% |
| Period 5 of 2026-27 | 908 | 83.6% | 6.6% |
| Period 4 of 2026-27 | 920 | 82.6% | 9.1% |
| Period 3 of 2026-27 | 910 | 85.2% | 2.4% |
| Period 2 of 2026-27 | 912 | 85.9% | 5.0% |
| Period 1 of 2026-27 | 1,056 | – | 5.0% |
| Period 13 of 2025-26 | 1,007 | 87.4% | 3.5% |
| Period 12 of 2025-26 | 916 | 83.5% | 3.4% |
| Period 11 of 2025-26 | 912 | 88.1% | 2.0% |
| Period 10 of 2025-26 | 838 | 83.2% | 6.6% |
| Period 9 of 2025-26 | 856 | 67.4% | 3.6% |
| Period 8 of 2025-26 | 809 | 69.4% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brierfield | 11,880 | 79.4% | 4.1% |
| Colne | 11,880 | 84.7% | 4.3% |
| Burnley Central | 11,887 | 82.8% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out