Brierfield
BRFNorth WestManaged by Northern Trains
How this station is performing
Brierfield had 11,880 scheduled stops to Period 7 of 2026-27, about 33 a day. 79.4% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Brierfield opened on 1 February 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Burnley Barracks is the oldest (1848) and Burnley Manchester Road the newest (1986), with Brierfield in between.
The nearest stations to Brierfield are Nelson (1.8 km north-east), Burnley Central (3.4 km south), Burnley Barracks (4.0 km south), Burnley Manchester Road (4.5 km south) and Colne (4.9 km north-east). 8 stations lie within 10 km in all. Of the five, Colne is the most punctual at 84.7% and Burnley Manchester Road the least at 71.5%, with Brierfield on 79.4%.
Brierfield takes its name from a town called Brierfield, home to about 9,472 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Brierfield was Period 9 of 2023-24, at 60.0%, some time before the latest year. The strongest was Period 13 of 2024-25, at 86.6%, and the two are 26.6 percentage points apart. Cancellations peaked at 11.0% of scheduled stops in Period 9 of 2023-24, against 4.1% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Brierfield is the least punctual, at 79.4%. All of them are ahead, including Colne (84.7%), Nelson (82.3%) and Burnley Central (82.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,880 | 79.4% | 4.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 912 | 77.2% | 3.3% |
| Period 6 of 2026-27 | 924 | 85.6% | 1.7% |
| Period 5 of 2026-27 | 908 | 82.1% | 6.4% |
| Period 4 of 2026-27 | 920 | 79.2% | 9.1% |
| Period 3 of 2026-27 | 910 | 82.1% | 2.4% |
| Period 2 of 2026-27 | 912 | 83.4% | 4.9% |
| Period 1 of 2026-27 | 1,056 | 78.7% | 4.7% |
| Period 13 of 2025-26 | 1,007 | 85.2% | 3.4% |
| Period 12 of 2025-26 | 916 | 79.7% | 3.2% |
| Period 11 of 2025-26 | 912 | 85.6% | 1.9% |
| Period 10 of 2025-26 | 838 | 83.0% | 6.4% |
| Period 9 of 2025-26 | 856 | 60.6% | 3.6% |
| Period 8 of 2025-26 | 809 | 67.0% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Colne | 11,880 | 84.7% | 4.3% |
| Nelson | 11,880 | 82.3% | 4.2% |
| Burnley Central | 11,887 | 82.8% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out