Nantwich
NANNorth WestManaged by TfW Rail
How this station is performing
Nantwich had 15,169 scheduled stops to Period 7 of 2026-27, about 42 a day. 69.3% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Nantwich opened on 1 September 1858, 168 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Nantwich is the newest; the oldest, Crewe, opened in 1837.
The nearest stations to Nantwich are Crewe (6.4 km north-east), Wrenbury (7.1 km south-west), Sandbach (12.8 km north-east), Winsford (14.2 km north) and Whitchurch (Shropshire) (14.7 km south-west). 2 stations lie within 10 km in all. Of the five, Sandbach is the most punctual at 82.0% and Winsford the least at 63.9%, with Nantwich on 69.3%.
Nantwich takes its name from a market town called Nantwich, home to about 14,051 people, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Nantwich was Period 9 of 2023-24, at 45.2%, some time before the latest year. The strongest was Period 12 of 2025-26, at 78.5%, and the two are 33.3 percentage points apart. Cancellations peaked at 5.5% of scheduled stops in Period 9 of 2024-25, against 2.4% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Nantwich is the least punctual, at 69.3%. All of them are ahead, including Bare Lane (86.2%), Morecambe (84.9%) and Rainhill (70.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 15,169 | 69.3% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Nantwich? Delay Repay
These operators call at Nantwich and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,154 | 65.6% | 1.2% |
| Period 6 of 2026-27 | 1,124 | 64.5% | 3.1% |
| Period 5 of 2026-27 | 1,149 | 64.0% | 3.1% |
| Period 4 of 2026-27 | 1,157 | 67.1% | 3.2% |
| Period 3 of 2026-27 | 1,089 | 70.0% | 2.1% |
| Period 2 of 2026-27 | 1,159 | 73.5% | 2.8% |
| Period 1 of 2026-27 | 1,352 | 77.1% | 1.6% |
| Period 13 of 2025-26 | 1,272 | 75.6% | 1.3% |
| Period 12 of 2025-26 | 1,160 | 78.5% | 0.9% |
| Period 11 of 2025-26 | 1,148 | 72.4% | 4.1% |
| Period 10 of 2025-26 | 1,068 | 70.1% | 2.7% |
| Period 9 of 2025-26 | 1,166 | 56.6% | 3.3% |
| Period 8 of 2025-26 | 1,171 | 64.2% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out