Bare Lane
BARNorth WestManaged by Northern Trains
How this station is performing
Bare Lane had 15,323 scheduled stops to Period 7 of 2026-27, about 42 a day. 86.2% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Bare Lane opened on 8 August 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Lancaster is the oldest (1846) and Heysham Port the newest (1904), with Bare Lane in between.
The nearest stations to Bare Lane are Morecambe (2.2 km west), Lancaster (3.4 km south-east), Heysham Port (6.8 km south-west), Carnforth (7.4 km north-east) and Silverdale (10.7 km north). 4 stations lie within 10 km in all. At 86.2%, Bare Lane is more punctual than every one of them; the best of the five, Morecambe, manages 84.9%.
Bare Lane is named after Bare, a Village, home to about 4,067 people, but the station stands 0.2 km from its centre.
Northern is the only operator serving Bare Lane. Here it manages 86.2% within three minutes, 7.6 percentage points better than its 78.6% across its whole network.
Compared with 3 stations of a similar size in North West, Bare Lane is the most punctual, at 86.2%. The comparison group includes Morecambe (84.9%), Nantwich (69.3%) and Rainhill (70.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 15,323 | 86.2% | 3.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,176 | 86.8% | 4.3% |
| Period 6 of 2026-27 | 1,176 | 83.9% | 1.9% |
| Period 5 of 2026-27 | 1,176 | 83.6% | 4.8% |
| Period 4 of 2026-27 | 1,176 | 84.5% | 2.6% |
| Period 3 of 2026-27 | 1,176 | 85.1% | 3.9% |
| Period 2 of 2026-27 | 1,176 | 84.9% | 4.1% |
| Period 1 of 2026-27 | 1,296 | 89.7% | 2.8% |
| Period 13 of 2025-26 | 1,280 | 87.3% | 4.2% |
| Period 12 of 2025-26 | 1,168 | 88.5% | 3.0% |
| Period 11 of 2025-26 | 1,160 | 91.1% | 1.6% |
| Period 10 of 2025-26 | 1,012 | 85.3% | 8.5% |
| Period 9 of 2025-26 | 1,176 | 84.2% | 4.5% |
| Period 8 of 2025-26 | 1,175 | 84.8% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out