Mottisfont and Dunbridge
DBGSouth EastManaged by South Western Railway
How this station is performing
Mottisfont and Dunbridge had 12,380 scheduled stops to Period 7 of 2026-27, about 34 a day. 76.9% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Mottisfont and Dunbridge opened on 1 March 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Mottisfont and Dunbridge is the oldest; the next oldest, Romsey, dates from 1847.
The nearest stations to Mottisfont and Dunbridge are Romsey (6.0 km south-east), Dean (Wilts) (6.2 km west), Chandlers Ford (12.7 km south-east), Totton (13.7 km south) and Redbridge (13.8 km south-east). 2 stations lie within 10 km in all. Of the five, Dean (Wilts) is the most punctual at 77.0% and Totton the least at 68.7%, with Mottisfont and Dunbridge on 76.9%.
Mottisfont and Dunbridge is named after Mottisfont, a Village, home to about 385 people, but the station stands 0.9 km from its centre.
Across the whole run of data, the weakest four-week period for Mottisfont and Dunbridge was Period 9 of 2024-25, at 63.9%, some time before the latest year. The strongest was Period 1 of 2024-25, at 87.9%, and the two are 24.0 percentage points apart. Cancellations peaked at 5.7% of scheduled stops in Period 1 of 2023-24, against 1.7% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Mottisfont and Dunbridge is the most punctual, at 76.9%. The comparison group includes Uckfield (76.0%), Ashurst (Kent) (74.6%) and Cowden (Kent) (68.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 12,380 | 76.9% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Mottisfont and Dunbridge? Delay Repay
These operators call at Mottisfont and Dunbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 871 | 73.2% | 0.7% |
| Period 6 of 2026-27 | 972 | 77.8% | 0.6% |
| Period 5 of 2026-27 | 972 | 73.2% | 0.7% |
| Period 4 of 2026-27 | 973 | 68.4% | 1.8% |
| Period 3 of 2026-27 | 971 | 76.1% | 3.1% |
| Period 2 of 2026-27 | 948 | 79.3% | 2.6% |
| Period 1 of 2026-27 | 1,059 | 81.0% | 1.0% |
| Period 13 of 2025-26 | 1,070 | 80.9% | 1.0% |
| Period 12 of 2025-26 | 949 | 82.3% | 0.5% |
| Period 11 of 2025-26 | 976 | 81.4% | 4.2% |
| Period 10 of 2025-26 | 892 | 79.2% | 2.8% |
| Period 9 of 2025-26 | 820 | 71.9% | 1.1% |
| Period 8 of 2025-26 | 907 | 74.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Uckfield | 12,366 | 76.0% | 5.6% |
| Ashurst (Kent) | 12,363 | 74.6% | 4.4% |
| Cowden (Kent) | 12,346 | 68.4% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out