Mill Hill (Lancs)
MLHNorth WestManaged by Northern Trains
How this station is performing
Mill Hill (Lancs) had 13,433 scheduled stops to Period 7 of 2026-27, about 37 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Mill Hill (Lancs) opened on 1 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Mill Hill (Lancs) is the oldest; the next oldest, Cherry Tree, dates from 1846.
The nearest stations to Mill Hill (Lancs) are Cherry Tree (1.2 km west), Blackburn (1.9 km north-east), Pleasington (2.9 km west), Darwen (4.8 km south-east) and Ramsgreave and Wilpshire (5.2 km north). 9 stations lie within 10 km in all. Of the five, Pleasington is the most punctual at 85.2% and Darwen the least at 70.3%, with Mill Hill (Lancs) on 84.9%.
Mill Hill (Lancs) is named after Mill Hill, a suburb, but the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Mill Hill (Lancs) was Period 9 of 2023-24, at 71.0%, some time before the latest year. The strongest was Period 6 of 2023-24, at 92.3%, and the two are 21.3 percentage points apart. Cancellations peaked at 8.2% of scheduled stops in Period 10 of 2023-24, against 3.0% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Mill Hill (Lancs) on 84.9%. The comparison group includes Bamber Bridge (83.6%), Lostock Hall (83.2%) and Strines (90.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,433 | 84.9% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,036 | 84.1% | 2.0% |
| Period 6 of 2026-27 | 1,036 | 89.0% | 1.2% |
| Period 5 of 2026-27 | 1,040 | 84.4% | 3.1% |
| Period 4 of 2026-27 | 1,036 | 84.1% | 4.1% |
| Period 3 of 2026-27 | 1,023 | 86.3% | 4.4% |
| Period 2 of 2026-27 | 1,040 | 85.6% | 4.4% |
| Period 1 of 2026-27 | 1,200 | 88.3% | 3.3% |
| Period 13 of 2025-26 | 1,132 | 89.9% | 2.4% |
| Period 12 of 2025-26 | 1,034 | 86.2% | 1.9% |
| Period 11 of 2025-26 | 1,022 | 89.6% | 1.3% |
| Period 10 of 2025-26 | 925 | 87.3% | 5.3% |
| Period 9 of 2025-26 | 984 | 73.4% | 2.7% |
| Period 8 of 2025-26 | 925 | 73.8% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bamber Bridge | 13,474 | 83.6% | 3.0% |
| Lostock Hall | 13,368 | 83.2% | 3.0% |
| Strines | 13,332 | 90.8% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out