Bamber Bridge
BMBNorth WestManaged by Northern Trains
How this station is performing
Bamber Bridge had 13,474 scheduled stops to Period 7 of 2026-27, about 37 a day. 83.6% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Bamber Bridge opened on 1 June 1846, 180 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Leyland is the oldest (1838) and Buckshaw Parkway the newest (2011), with Bamber Bridge in between.
The nearest stations to Bamber Bridge are Lostock Hall (1.8 km west), Leyland (3.6 km south-west), Preston (Lancs) (4.4 km north-west), Buckshaw Parkway (6.0 km south) and Euxton Balshaw Lane (7.5 km south). 8 stations lie within 10 km in all. Of the five, Euxton Balshaw Lane is the most punctual at 84.2% and Buckshaw Parkway the least at 59.8%, with Bamber Bridge on 83.6%.
Bamber Bridge takes its name from a Village called Bamber Bridge, home to about 12,126 people, and the station stands 0.1 km from its centre.
2 of 3 stations of a similar size in North West are more punctual than Bamber Bridge on 83.6%. The comparison group includes Mill Hill (Lancs) (84.9%), Lostock Hall (83.2%) and Strines (90.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,474 | 83.6% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,039 | 79.8% | 2.0% |
| Period 6 of 2026-27 | 1,040 | 86.8% | 1.2% |
| Period 5 of 2026-27 | 1,044 | 84.0% | 3.2% |
| Period 4 of 2026-27 | 1,040 | 82.4% | 4.3% |
| Period 3 of 2026-27 | 1,026 | 85.0% | 4.5% |
| Period 2 of 2026-27 | 1,044 | 86.4% | 4.5% |
| Period 1 of 2026-27 | 1,204 | 88.8% | 3.3% |
| Period 13 of 2025-26 | 1,137 | 88.5% | 2.4% |
| Period 12 of 2025-26 | 1,035 | 86.3% | 1.9% |
| Period 11 of 2025-26 | 1,025 | 87.8% | 1.3% |
| Period 10 of 2025-26 | 929 | 84.8% | 5.3% |
| Period 9 of 2025-26 | 984 | 71.4% | 2.9% |
| Period 8 of 2025-26 | 927 | 72.0% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mill Hill (Lancs) | 13,433 | 84.9% | 3.0% |
| Lostock Hall | 13,368 | 83.2% | 3.0% |
| Strines | 13,332 | 90.8% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out