Meols
MEONorth WestManaged by Merseyrail
How this station is performing
Meols has usable figures for 3 of the last 13 four-week periods to Period 7 of 2026-27, covering 40,363 scheduled stops, about 111 a day. In those periods 77.8% of stops arrived within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Meols opened on 18 June 1866, 160 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Meols is the oldest; the next oldest, Hoylake, dates from 1866.
The nearest stations to Meols are Manor Road (1.2 km south-west), Hoylake (1.9 km south-west), Moreton (Merseyside) (2.9 km east), West Kirby (3.5 km south-west) and Leasowe (3.8 km east). 18 stations lie within 10 km in all. Of the five, Manor Road is the most punctual at 98.4% and Leasowe the least at 72.4%, with Meols on 77.8%.
Meols takes its name from a Village called Meols, home to about 5,110 people, and the station stands 0.2 km from its centre.
For Meols, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 72.5% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 94.7%, which is 22.2 percentage points higher. Cancellations peaked at 5.0% of scheduled stops in Period 11 of 2024-25, against 1.7% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 40,363 | 77.8% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Meols? Delay Repay
These operators call at Meols and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,084 | – | 1.2% |
| Period 6 of 2026-27 | 3,084 | – | 2.5% |
| Period 5 of 2026-27 | 3,084 | – | 2.7% |
| Period 4 of 2026-27 | 2,903 | – | 1.7% |
| Period 3 of 2026-27 | 3,084 | – | 1.8% |
| Period 2 of 2026-27 | 3,084 | – | 1.2% |
| Period 1 of 2026-27 | 3,556 | – | 1.6% |
| Period 13 of 2025-26 | 3,384 | – | 0.8% |
| Period 12 of 2025-26 | 3,084 | – | 2.6% |
| Period 11 of 2025-26 | 3,084 | – | 1.1% |
| Period 10 of 2025-26 | 2,757 | 78.9% | 1.3% |
| Period 9 of 2025-26 | 3,083 | 72.5% | 2.5% |
| Period 8 of 2025-26 | 3,092 | 82.1% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out