Matlock Bath
MTBEast MidlandsManaged by East Midlands Railway
How this station is performing
Matlock Bath has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,721 scheduled stops, about 35 a day. In those periods 88.1% of stops arrived within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Matlock Bath opened on 4 June 1849 and closed to passengers on 6 March 1967. It reopened on 27 May 1972, 54 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Ambergate is the oldest (1840) and Whatstandwell the newest (1853), with Matlock Bath in between.
The nearest stations to Matlock Bath are Cromford (1.2 km south-east), Matlock (1.7 km north), Whatstandwell (5.6 km south-east), Ambergate (8.6 km south-east) and Belper (12.0 km south-east). 4 stations lie within 10 km in all. At 88.1%, Matlock Bath is more punctual than every one of them; the best of the five, Cromford, manages 87.5%.
Matlock Bath takes its name from a Village called Matlock Bath, home to about 829 people, and the station stands 1.4 km from its centre.
Compared with 3 stations of a similar size in East Midlands, Matlock Bath is the most punctual, at 88.1%. The comparison group includes Cromford (87.5%), Matlock (85.4%) and Whatstandwell (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 12,721 | 88.1% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Matlock Bath? Delay Repay
These operators call at Matlock Bath and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 972 | 88.2% | 1.0% |
| Period 6 of 2026-27 | 976 | 88.2% | 3.3% |
| Period 5 of 2026-27 | 976 | 88.2% | 3.5% |
| Period 4 of 2026-27 | 972 | 84.7% | 3.1% |
| Period 3 of 2026-27 | 966 | 87.1% | 2.7% |
| Period 2 of 2026-27 | 976 | 86.3% | 2.8% |
| Period 1 of 2026-27 | 1,118 | 88.0% | 1.6% |
| Period 13 of 2025-26 | 1,068 | 87.8% | 2.5% |
| Period 12 of 2025-26 | 972 | 91.1% | 3.4% |
| Period 11 of 2025-26 | 963 | 92.9% | 2.8% |
| Period 10 of 2025-26 | 864 | 92.3% | 3.7% |
| Period 9 of 2025-26 | 942 | 83.4% | 2.5% |
| Period 8 of 2025-26 | 956 | – | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cromford | 12,721 | 87.5% | 2.6% |
| Matlock | 12,721 | 85.4% | 2.6% |
| Whatstandwell | 12,721 | 84.8% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out