Matlock
MATEast MidlandsManaged by East Midlands Railway
How this station is performing
Matlock had 12,721 scheduled stops to Period 7 of 2026-27, about 35 a day. 85.4% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Matlock opened on 4 June 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ambergate is the oldest (1840) and Alfreton the newest (1862), with Matlock in between.
The nearest stations to Matlock are Matlock Bath (1.7 km south), Cromford (2.9 km south), Whatstandwell (7.1 km south-east), Ambergate (10.1 km south-east) and Alfreton (13.3 km east). 3 stations lie within 10 km in all. Of the five, Matlock Bath is the most punctual at 88.1% and Alfreton the least at 71.1%, with Matlock on 85.4%.
Matlock takes its name from a town called Matlock, home to about 15,519 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Matlock was Period 9 of 2024-25, at 66.9%, some time before the latest year. The strongest was Period 11 of 2025-26, at 91.2%, and the two are 24.3 percentage points apart. Cancellations peaked at 7.9% of scheduled stops in Period 8 of 2023-24, against 2.6% over the latest 13 periods.
2 of 3 stations of a similar size in East Midlands are more punctual than Matlock on 85.4%. The comparison group includes Cromford (87.5%), Matlock Bath (88.1%) and Whatstandwell (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 12,721 | 85.4% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Matlock? Delay Repay
These operators call at Matlock and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 972 | 85.0% | 1.0% |
| Period 6 of 2026-27 | 976 | 85.8% | 3.3% |
| Period 5 of 2026-27 | 976 | 83.2% | 3.6% |
| Period 4 of 2026-27 | 972 | 84.5% | 3.1% |
| Period 3 of 2026-27 | 966 | 83.2% | 2.7% |
| Period 2 of 2026-27 | 976 | 84.5% | 2.8% |
| Period 1 of 2026-27 | 1,118 | 87.3% | 1.6% |
| Period 13 of 2025-26 | 1,068 | 85.0% | 2.5% |
| Period 12 of 2025-26 | 972 | 88.5% | 3.4% |
| Period 11 of 2025-26 | 963 | 91.2% | 2.8% |
| Period 10 of 2025-26 | 864 | 88.2% | 3.7% |
| Period 9 of 2025-26 | 942 | 79.1% | 2.5% |
| Period 8 of 2025-26 | 956 | 83.8% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cromford | 12,721 | 87.5% | 2.6% |
| Matlock Bath | 12,721 | 88.1% | 2.6% |
| Whatstandwell | 12,721 | 84.8% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out