Marston Green
MGNWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Marston Green had 24,824 scheduled stops to Period 7 of 2026-27, about 68 a day. 80.1% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
The nearest stations to Marston Green are Lea Hall (2.6 km north-west), Birmingham International (2.8 km south-east), Stechford (4.3 km north-west), Olton (4.6 km south-west) and Acocks Green (4.7 km south-west). 26 stations lie within 10 km in all. Of the five, Acocks Green is the most punctual at 89.6% and Birmingham International the least at 66.8%, with Marston Green on 80.1%.
Marston Green takes its name from a Village called Marston Green, home to about 7,432 people, and the station stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Marston Green was Period 9 of 2024-25, at 73.5%, some time before the latest year. The strongest was Period 12 of 2024-25, at 88.7%, and the two are 15.2 percentage points apart. Cancellations peaked at 6.8% of scheduled stops in Period 4 of 2026-27, against 2.8% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Marston Green is the least punctual, at 80.1%. All of them are ahead, including Hagley (87.5%), Alvechurch (85.7%) and Stratford-upon-Avon Parkway (89.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 24,824 | 80.1% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Marston Green? Delay Repay
These operators call at Marston Green and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,040 | 76.4% | 3.3% |
| Period 6 of 2026-27 | 2,043 | 75.8% | 2.3% |
| Period 5 of 2026-27 | 1,616 | 80.5% | 4.4% |
| Period 4 of 2026-27 | 1,385 | 78.8% | 6.8% |
| Period 3 of 2026-27 | 1,514 | 80.8% | 2.0% |
| Period 2 of 2026-27 | 1,835 | 81.9% | 3.1% |
| Period 1 of 2026-27 | 2,342 | 83.6% | 1.5% |
| Period 13 of 2025-26 | 2,250 | 83.3% | 1.4% |
| Period 12 of 2025-26 | 2,033 | 83.1% | 0.8% |
| Period 11 of 2025-26 | 2,011 | 82.7% | 4.6% |
| Period 10 of 2025-26 | 1,868 | 80.1% | 2.7% |
| Period 9 of 2025-26 | 2,046 | 75.1% | 2.2% |
| Period 8 of 2025-26 | 1,841 | 78.2% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hagley | 25,224 | 87.5% | 3.5% |
| Alvechurch | 25,227 | 85.7% | 4.2% |
| Stratford-upon-Avon Parkway | 25,232 | 89.7% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out