CrossCountry at March
All trains at MarchCrossCountry across BritainEast of England
How this operator is doing here
CrossCountry had 11,055 scheduled stops at March in the 13 periods to Period 7 of 2026-27, 58% of the station's total. 65.0% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
CrossCountry trains at March also serve Manea (9.1 km south-east, 61.9% on time, 3.1% cancelled), Whittlesea (14.2 km west, 66.6% on time, 3.8% cancelled), Ely (22.2 km south-east, 61.4% on time, 3.5% cancelled), Peterborough (23.1 km west, 56.7% on time, 3.2% cancelled), Waterbeach (33.8 km south, – on time, – cancelled) and Cambridge North (37.6 km south, – on time, – cancelled), which are the stations on its network closest to March.
The busiest CrossCountry station within 30 km of March is Peterborough, 23.1 km west, with about 32 scheduled stops a day.
Of the 3 operators with enough records at March, CrossCountry is the least punctual, at 65.0%.
For CrossCountry, March is the 44th best of 99 ranked stations. Its 65.0% here is 1.8 percentage points above the 63.2% across the whole network.
CrossCountry at March has slipped sharply. 65.0% of stops came within three minutes of the timetable in the latest 13 periods, 11.3 percentage points worse than the 76.3% recorded in the 13 before. Cancellations fell to 3.4% of scheduled stops from 4.6%, which is 1.2 percentage points fewer.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 808 | 51.5% | 2.8% |
| Period 6 of 2026-27 | 890 | 44.5% | 2.7% |
| Period 5 of 2026-27 | 885 | 53.8% | 3.8% |
| Period 4 of 2026-27 | 868 | 55.7% | 3.0% |
| Period 3 of 2026-27 | 864 | 66.5% | 3.5% |
| Period 2 of 2026-27 | 730 | 65.0% | 2.6% |
| Period 1 of 2026-27 | 929 | 77.3% | 1.6% |
| Period 13 of 2025-26 | 976 | 76.3% | 2.6% |
| Period 12 of 2025-26 | 890 | 77.9% | 3.4% |
| Period 11 of 2025-26 | 861 | 76.4% | 3.0% |
| Period 10 of 2025-26 | 775 | 70.9% | 8.9% |
| Period 9 of 2025-26 | 867 | 61.9% | 4.6% |
| Period 8 of 2025-26 | 712 | 65.9% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at March
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 5,293 | 70.2% | 2.0% |
| East Midlands Railway | 2,586 | 71.8% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out