Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Manchester Piccadilly

MANNorth WestManaged by Network Rail

On time, last 13 periods69.6%Great Britain: 83.6%
Cancelled3.6%Great Britain: 3.2%
Stops a day901Scheduled, on average
Punctuality rank2147th of 2,374Among ranked stations

How this station is performing

Manchester Piccadilly had 327,815 scheduled stops to Period 7 of 2026-27, about 901 a day. 69.6% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.

Manchester Piccadilly opened on 10 May 1842, 184 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Salford Central is the oldest (1838) and Deansgate the newest (1849), with Manchester Piccadilly in between.

The nearest stations to Manchester Piccadilly are Manchester Oxford Road (0.9 km south-west), Ardwick (1.3 km south-east), Deansgate (1.4 km west), Manchester Victoria (1.4 km north-west) and Salford Central (1.8 km west). 37 stations lie within 10 km in all. Of the five, Salford Central is the most punctual at 78.5% and Manchester Oxford Road the least at 55.5%, with Manchester Piccadilly on 69.6%.

Manchester Piccadilly is named after Manchester, a city status in the United Kingdom, home to about 547,627 people, but the station stands 1.0 km from its centre.

6 operators call at Manchester Piccadilly: Northern (75.9%, 56% of stops), TransPennine Express (65.8%, 17% of stops), Avanti (52.8%, 10% of stops), Transport for Wales (68.3%, 8% of stops) and CrossCountry (60.6%, 6% of stops). The operator you travel with matters: Northern reaches 75.9% within three minutes while East Midlands Railway manages 47.7%, a gap of 28.2 percentage points.

Compared with 3 stations of a similar size in North West, Manchester Piccadilly is the least punctual, at 69.6%. All of them are ahead, including Liverpool Lime Street (79.8%), Liverpool Central (91.0%) and Moorfields (92.6%).

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 80.8%Period 2 of 2023-24: 76.9%Period 3 of 2023-24: 73.4%Period 4 of 2023-24: 76.9%Period 5 of 2023-24: 75.9%Period 6 of 2023-24: 76.3%Period 7 of 2023-24: 71.9%Period 8 of 2023-24: 68.6%Period 9 of 2023-24: 61.1%Period 10 of 2023-24: 72.4%Period 11 of 2023-24: 73.9%Period 12 of 2023-24: 78.7%Period 13 of 2023-24: 79.9%Period 1 of 2024-25: 79.2%Period 2 of 2024-25: 78.6%Period 3 of 2024-25: 75.8%Period 4 of 2024-25: 74.4%Period 5 of 2024-25: 72.6%Period 6 of 2024-25: 68.6%Period 7 of 2024-25: 67.7%Period 8 of 2024-25: 67.9%Period 9 of 2024-25: 63.8%Period 10 of 2024-25: 68.8%Period 11 of 2024-25: 72.1%Period 12 of 2024-25: 75.5%Period 13 of 2024-25: 79.9%Period 1 of 2025-26: 74.9%Period 2 of 2025-26: 72.6%Period 3 of 2025-26: 74.6%Period 4 of 2025-26: 71.4%Period 5 of 2025-26: 72.5%Period 6 of 2025-26: 75.2%Period 7 of 2025-26: 70.1%Period 8 of 2025-26: 66.8%Period 9 of 2025-26: 60.0%Period 10 of 2025-26: 70.2%Period 11 of 2025-26: 71.9%Period 12 of 2025-26: 73.4%Period 13 of 2025-26: 74.9%Period 1 of 2026-27: 73.8%Period 2 of 2026-27: 72.2%Period 3 of 2026-27: 68.3%Period 4 of 2026-27: 67.1%Period 5 of 2026-27: 68.1%Period 6 of 2026-27: 69.2%Period 7 of 2026-27: 69.4%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 2.3%Period 2 of 2023-24: 3.1%Period 3 of 2023-24: 4.6%Period 4 of 2023-24: 3.1%Period 5 of 2023-24: 3.5%Period 6 of 2023-24: 3.2%Period 7 of 2023-24: 4.3%Period 8 of 2023-24: 4.6%Period 9 of 2023-24: 5.4%Period 10 of 2023-24: 5.2%Period 11 of 2023-24: 3.7%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 2.3%Period 1 of 2024-25: 2.9%Period 2 of 2024-25: 4.1%Period 3 of 2024-25: 4.4%Period 4 of 2024-25: 4.7%Period 5 of 2024-25: 4.3%Period 6 of 2024-25: 5.2%Period 7 of 2024-25: 4.9%Period 8 of 2024-25: 7.3%Period 9 of 2024-25: 6.4%Period 10 of 2024-25: 8.6%Period 11 of 2024-25: 4.2%Period 12 of 2024-25: 2.8%Period 13 of 2024-25: 2.0%Period 1 of 2025-26: 2.2%Period 2 of 2025-26: 3.1%Period 3 of 2025-26: 3.3%Period 4 of 2025-26: 3.6%Period 5 of 2025-26: 3.4%Period 6 of 2025-26: 2.8%Period 7 of 2025-26: 3.0%Period 8 of 2025-26: 2.8%Period 9 of 2025-26: 5.0%Period 10 of 2025-26: 4.5%Period 11 of 2025-26: 3.4%Period 12 of 2025-26: 2.2%Period 13 of 2025-26: 3.2%Period 1 of 2026-27: 4.8%Period 2 of 2026-27: 3.4%Period 3 of 2026-27: 3.6%Period 4 of 2026-27: 4.1%Period 5 of 2026-27: 4.3%Period 6 of 2026-27: 2.7%Period 7 of 2026-27: 2.8%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern185,06475.9%2.7%
TransPennine Express55,37265.8%3.5%
Avanti31,31752.8%5.8%
Transport for Wales24,85768.3%4.9%
CrossCountry20,74260.6%6.5%
East Midlands Railway10,46347.7%4.7%

Operators with their own page for this station are linked to it.

Late train at Manchester Piccadilly? Delay Repay

These operators call at Manchester Piccadilly and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2725,34369.4%2.8%
Period 6 of 2026-2725,81069.2%2.7%
Period 5 of 2026-2725,31768.1%4.3%
Period 4 of 2026-2725,77767.1%4.1%
Period 3 of 2026-2724,79168.3%3.6%
Period 2 of 2026-2725,12172.2%3.4%
Period 1 of 2026-2728,83973.8%4.8%
Period 13 of 2025-2627,96074.9%3.2%
Period 12 of 2025-2619,10173.4%2.2%
Period 11 of 2025-2625,27671.9%3.4%
Period 10 of 2025-2623,13370.2%4.5%
Period 9 of 2025-2625,74960.0%5.0%
Period 8 of 2025-2625,59866.8%2.8%

Time of year

60%70%80%90%P1: 77.1%1P2: 74.9%2P3: 73.0%3P4: 72.3%4P5: 72.2%5P6: 72.2%6P7: 69.7%7P8: 67.7%8P9: 61.6%9P10: 70.5%10P11: 72.6%11P12: 76.0%12P13: 78.2%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Liverpool Lime Street240,96479.8%3.2%
Liverpool Central211,83991.0%2.1%
Moorfields210,83992.6%2.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out