Manchester Airport
MIANorth WestManaged by TransPennine Express
How this station is performing
Manchester Airport had 93,105 scheduled stops to Period 7 of 2026-27, about 256 a day. 72.4% of recorded arrivals were within three minutes of the timetable and 5.7% of scheduled stops were cancelled.
Manchester Airport opened on 16 May 1993, 33 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Manchester Airport is the newest; the oldest, Handforth, opened in 1842.
The nearest stations to Manchester Airport are Heald Green (2.4 km east), Styal (2.8 km south-east), Gatley (4.2 km north-east), Handforth (4.4 km south-east) and Ashley (4.7 km west). 22 stations lie within 10 km in all. Of the five, Handforth is the most punctual at 85.3% and Gatley the least at 65.4%, with Manchester Airport on 72.4%.
Manchester Airport serves an airport 12.8 km from the centre of Manchester, a city status in the United Kingdom, home to about 547,627 people.
3 operators call at Manchester Airport: Northern (68.7%, 60% of stops), TransPennine Express (77.8%, 27% of stops) and Transport for Wales (78.4%, 13% of stops). The operator you travel with matters: Transport for Wales reaches 78.4% within three minutes while Northern manages 68.7%, a gap of 9.7 percentage points.
2 of 3 stations of a similar size in North West are more punctual than Manchester Airport on 72.4%. The comparison group includes Salford Crescent (74.3%), Kirkdale (91.2%) and Bolton (60.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 56,026 | 68.7% | 5.5% |
| TransPennine Express | 25,001 | 77.8% | 5.5% |
| Transport for Wales | 12,078 | 78.4% | 6.9% |
Operators with their own page for this station are linked to it.
Late train at Manchester Airport? Delay Repay
These operators call at Manchester Airport and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,142 | 72.5% | 5.4% |
| Period 6 of 2026-27 | 7,616 | 73.3% | 4.7% |
| Period 5 of 2026-27 | 7,270 | 73.6% | 6.2% |
| Period 4 of 2026-27 | 7,303 | 72.6% | 6.3% |
| Period 3 of 2026-27 | 7,471 | 70.5% | 7.2% |
| Period 2 of 2026-27 | 6,783 | 74.5% | 5.1% |
| Period 1 of 2026-27 | 8,186 | 75.6% | 4.3% |
| Period 13 of 2025-26 | 7,831 | 76.5% | 6.2% |
| Period 12 of 2025-26 | 5,410 | 77.7% | 4.1% |
| Period 11 of 2025-26 | 7,194 | 73.8% | 3.8% |
| Period 10 of 2025-26 | 6,578 | 70.2% | 6.0% |
| Period 9 of 2025-26 | 7,271 | 61.9% | 9.2% |
| Period 8 of 2025-26 | 7,050 | 68.3% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Salford Crescent | 88,724 | 74.3% | 3.4% |
| Kirkdale | 85,826 | 91.2% | 1.7% |
| Bolton | 84,707 | 60.6% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out