Malton
MLTYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Malton had 12,928 scheduled stops to Period 7 of 2026-27, about 36 a day. 84.6% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Malton opened on 8 July 1845, 181 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, York is the oldest (1839) and Poppleton the newest (1848), with Malton in between.
Malton is remote: its nearest neighbours are York (27.3 km south-west), Seamer (27.6 km north-east), Driffield (27.8 km south-east), Poppleton (28.7 km south-west) and Nafferton (30.0 km south-east). At 84.6%, Malton is more punctual than every one of them; the best of the five, Seamer, manages 82.0%.
Malton is one of 2 stations named after a market town called Malton, home to about 6,321 people; this one stands 0.9 km from its centre.
For Malton, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 72.5% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2025-26, at 96.4%, which is 23.9 percentage points higher.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Malton is the most punctual, at 84.6%. The comparison group includes Darton (79.1%), Darnall (83.2%) and South Elmsall (72.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 12,928 | 84.6% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Malton? Delay Repay
These operators call at Malton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 983 | 72.5% | 1.0% |
| Period 6 of 2026-27 | 970 | 78.8% | 1.8% |
| Period 5 of 2026-27 | 973 | 84.0% | 1.8% |
| Period 4 of 2026-27 | 984 | 82.5% | 1.3% |
| Period 3 of 2026-27 | 984 | 85.5% | 2.3% |
| Period 2 of 2026-27 | 982 | 83.0% | 1.8% |
| Period 1 of 2026-27 | 1,127 | 87.3% | 1.9% |
| Period 13 of 2025-26 | 1,085 | 88.4% | 0.6% |
| Period 12 of 2025-26 | 984 | 88.6% | 0.5% |
| Period 11 of 2025-26 | 984 | 89.2% | 0.3% |
| Period 10 of 2025-26 | 905 | 89.9% | 1.0% |
| Period 9 of 2025-26 | 983 | 80.7% | 1.8% |
| Period 8 of 2025-26 | 984 | 88.2% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Darton | 12,716 | 79.1% | 1.6% |
| Darnall | 13,203 | 83.2% | 2.1% |
| South Elmsall | 13,211 | 72.0% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out