Maidenhead
MAISouth EastManaged by Great Western Railway
How this station is performing
Maidenhead had 96,916 scheduled stops to Period 7 of 2026-27, about 266 a day. 83.6% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Maidenhead opened on 1 August 1854. It was moved to the site it uses now on 1 November 1871. Among the 5 stations nearest to it with a known opening date, Taplow is the oldest (1838) and Furze Platt the newest (1937), with Maidenhead in between.
The nearest stations to Maidenhead are Furze Platt (1.7 km north), Taplow (2.9 km east), Cookham (4.3 km north), Burnham (Buckinghamshire) (5.2 km east) and Bourne End (6.5 km north). 9 stations lie within 10 km in all. Of the five, Bourne End is the most punctual at 92.6% and Taplow the least at 82.7%, with Maidenhead on 83.6%.
Maidenhead takes its name from a town called Maidenhead, home to about 63,580 people, and the station stands 0.5 km from its centre.
2 operators call at Maidenhead: Elizabeth line (84.7%, 54% of stops) and Great Western Railway (82.4%, 46% of stops). They are close together, with Elizabeth line leading on 84.7% and Great Western Railway trailing on 82.4%, a gap of 2.3 percentage points.
Compared with 3 stations of a similar size in South East, Maidenhead is the most punctual, at 83.6%. The comparison group includes Gravesend (81.7%), Ashford International (78.7%) and Havant (74.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 52,319 | 84.7% | 4.0% |
| Great Western Railway | 44,597 | 82.4% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Maidenhead? Delay Repay
These operators call at Maidenhead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,544 | 83.4% | 2.8% |
| Period 6 of 2026-27 | 6,768 | 82.0% | 4.5% |
| Period 5 of 2026-27 | 7,482 | 81.9% | 6.5% |
| Period 4 of 2026-27 | 7,311 | 83.9% | 2.7% |
| Period 3 of 2026-27 | 7,248 | 85.3% | 5.3% |
| Period 2 of 2026-27 | 7,425 | 85.3% | 4.3% |
| Period 1 of 2026-27 | 8,513 | 85.1% | 5.1% |
| Period 13 of 2025-26 | 8,222 | 86.4% | 2.2% |
| Period 12 of 2025-26 | 7,537 | 83.5% | 2.7% |
| Period 11 of 2025-26 | 7,506 | 85.8% | 5.2% |
| Period 10 of 2025-26 | 6,402 | 82.8% | 3.8% |
| Period 9 of 2025-26 | 7,504 | 79.5% | 3.0% |
| Period 8 of 2025-26 | 7,454 | 81.8% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gravesend | 96,898 | 81.7% | 3.5% |
| Ashford International | 97,043 | 78.7% | 1.3% |
| Havant | 92,820 | 74.5% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out