How this operator is doing here
West Midlands Railway had 22,335 scheduled stops at Lye (West Midlands) in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 88.3% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
West Midlands Railway trains at Lye (West Midlands) also serve Stourbridge Town (1.8 km west, 100.0% on time, 1.1% cancelled), Stourbridge Junction (1.8 km south-west, 95.3% on time, 2.0% cancelled), Cradley Heath (2.0 km north-east, 88.2% on time, 3.6% cancelled), Old Hill (4.3 km east, 88.9% on time, 3.7% cancelled), Hagley (4.7 km south-west, 87.5% on time, 3.5% cancelled) and Rowley Regis (6.1 km east, 88.2% on time, 3.5% cancelled), which are the stations on its network closest to Lye (West Midlands).
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 1.8 km west (100.0%), and worst at Penkridge, 29.3 km north (57.1%).
The busiest West Midlands Railway station within 30 km of Lye (West Midlands) is Birmingham New Street, 14.9 km east, with about 532 scheduled stops a day.
Of the 1 operators with enough records at Lye (West Midlands), West Midlands Railway is the most punctual, at 88.3%.
For West Midlands Railway, Lye (West Midlands) is the 48th best of 169 ranked stations. Its 88.3% here is 7.2 percentage points above the 81.1% across the whole network.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,772 | 86.0% | 2.1% |
| Period 6 of 2026-27 | 1,772 | 86.1% | 1.5% |
| Period 5 of 2026-27 | 1,292 | 85.1% | 6.7% |
| Period 4 of 2026-27 | 1,633 | 85.8% | 4.7% |
| Period 3 of 2026-27 | 1,680 | 89.1% | 3.6% |
| Period 2 of 2026-27 | 1,633 | 87.7% | 4.2% |
| Period 1 of 2026-27 | 2,055 | 91.9% | 3.7% |
| Period 13 of 2025-26 | 1,932 | 90.8% | 3.5% |
| Period 12 of 2025-26 | 1,772 | 92.1% | 2.5% |
| Period 11 of 2025-26 | 1,706 | 91.9% | 3.0% |
| Period 10 of 2025-26 | 1,547 | 88.4% | 4.7% |
| Period 9 of 2025-26 | 1,771 | 84.4% | 4.0% |
| Period 8 of 2025-26 | 1,770 | 86.2% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lye (West Midlands)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 247 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out