How this operator is doing here
GTR had 80,591 scheduled stops at Luton in the 13 periods to Period 7 of 2026-27, 78% of the station's total. 82.8% of recorded arrivals came within three minutes and 5.1% of stops were cancelled.
GTR trains at Luton also serve Luton Airport Parkway (1.6 km south-east, 79.5% on time, 5.1% cancelled), Leagrave (4.0 km north-west, 85.5% on time, 6.1% cancelled), Harpenden (8.7 km south-east, 80.1% on time, 5.7% cancelled), Harlington (Bedfordshire) (10.4 km north-west, 84.6% on time, 6.1% cancelled), Hitchin (13.0 km north-east, 77.3% on time, 6.9% cancelled) and Stevenage (14.4 km east, 80.7% on time, 6.1% cancelled), which are the stations on its network closest to Luton.
Within 30 km of here, GTR runs best at Cuffley, 28.5 km south-east (92.1%), and worst at Elstree and Borehamwood, 27.2 km south (70.9%).
The busiest GTR station within 30 km of Luton is St Albans City, 15.8 km south, with about 329 scheduled stops a day.
Of the 2 operators with enough records at Luton, GTR is the most punctual, at 82.8%.
For GTR, Luton ranks 171st of 307 stations and is typical: 82.8% here against 82.9% across the network, a difference of 0.1 percentage points.
Cancellations of GTR at Luton are near its usual level: 5.1% of scheduled stops, against 4.7% across its network and 5.4% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,479 | 81.7% | 3.4% |
| Period 6 of 2026-27 | 6,197 | 78.6% | 5.9% |
| Period 5 of 2026-27 | 5,674 | 77.9% | 7.8% |
| Period 4 of 2026-27 | 6,103 | 78.7% | 6.3% |
| Period 3 of 2026-27 | 5,002 | 82.5% | 3.3% |
| Period 2 of 2026-27 | 5,818 | 86.8% | 3.3% |
| Period 1 of 2026-27 | 6,836 | 88.1% | 3.0% |
| Period 13 of 2025-26 | 7,104 | 85.8% | 2.6% |
| Period 12 of 2025-26 | 6,415 | 86.5% | 6.2% |
| Period 11 of 2025-26 | 6,456 | 83.0% | 5.8% |
| Period 10 of 2025-26 | 5,681 | 85.6% | 6.0% |
| Period 9 of 2025-26 | 6,471 | 78.2% | 8.9% |
| Period 8 of 2025-26 | 6,355 | 81.6% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Luton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 23,141 | 70.7% | 6.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out