Grand Central at Low Moor
All trains at Low MoorGrand Central across BritainYorkshire and The Humber
How this operator is doing here
Grand Central had 2,615 scheduled stops at Low Moor in the 13 periods to Period 7 of 2026-27, 10% of the station's total. 65.0% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Grand Central trains at Low Moor also serve Bradford Interchange (4.5 km north, 68.1% on time, 2.2% cancelled), Brighouse (6.0 km south, 61.8% on time, 2.3% cancelled), Halifax (7.4 km south-west, 64.9% on time, 2.4% cancelled), Mirfield (9.6 km south-east, 59.1% on time, 2.3% cancelled), Wakefield Westgate (17.9 km south-east, – on time, – cancelled) and Wakefield Kirkgate (19.1 km south-east, 60.3% on time, 2.0% cancelled), which are the stations on its network closest to Low Moor.
The busiest Grand Central station within 30 km of Low Moor is Bradford Interchange, 4.5 km north, with about 8 scheduled stops a day.
Of the 2 operators with enough records at Low Moor, Grand Central is the least punctual, at 65.0%.
For Grand Central, Low Moor is the 6th best of 17 ranked stations. Its 65.0% here is 2.8 percentage points above the 62.2% across the whole network.
Grand Central at Low Moor has not moved in one direction over three full railway years: 66.5% within three minutes in 2023-24, 66.0% in 2024-25 and 67.7% in 2025-26.
Period by period
See how Grand Central Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 220 | 62.7% | 7.3% |
| Period 6 of 2026-27 | 177 | 66.1% | 0.0% |
| Period 5 of 2026-27 | 185 | 60.0% | 2.2% |
| Period 4 of 2026-27 | 223 | 59.4% | 1.8% |
| Period 3 of 2026-27 | 172 | 58.1% | 2.9% |
| Period 2 of 2026-27 | 201 | 67.4% | 3.5% |
| Period 1 of 2026-27 | 254 | 64.1% | 1.2% |
| Period 13 of 2025-26 | 231 | 69.6% | 1.7% |
| Period 12 of 2025-26 | 176 | 68.4% | 1.1% |
| Period 11 of 2025-26 | 215 | 74.5% | 1.4% |
| Period 10 of 2025-26 | 176 | 72.1% | 2.3% |
| Period 9 of 2025-26 | 185 | 54.2% | 4.3% |
| Period 8 of 2025-26 | 200 | 67.2% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Low Moor
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,004 | 71.7% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out