Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Lostwithiel

All trains at LostwithielCrossCountry across BritainSouth West

On time, last 13 periods57.1%Whole station: 69.1%
Cancelled11.5%Whole station: 6.5%
Scheduled stops848Of 16,403 at the station

How this operator is doing here

CrossCountry had 848 scheduled stops at Lostwithiel in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 57.1% of recorded arrivals came within three minutes and 11.5% of stops were cancelled.

CrossCountry trains at Lostwithiel also serve Bodmin Parkway (4.3 km north, 58.9% on time, 11.7% cancelled), Par (6.3 km south-west, 56.6% on time, 10.7% cancelled), St Austell (11.5 km south-west, 59.5% on time, 12.2% cancelled), Liskeard (14.6 km east, 55.3% on time, 11.6% cancelled), Truro (32.4 km south-west, 56.4% on time, 12.9% cancelled) and Plymouth (37.2 km east, 69.8% on time, 7.5% cancelled), which are the stations on its network closest to Lostwithiel.

The busiest CrossCountry station within 30 km of Lostwithiel is Bodmin Parkway, 4.3 km north, with about 4 scheduled stops a day.

Of the 2 operators with enough records at Lostwithiel, CrossCountry is the least punctual, at 57.1%.

For CrossCountry, Lostwithiel is the 80th best of 99 ranked stations. Its 57.1% here is 6.1 percentage points below the 63.2% across the whole network.

CrossCountry cancels more at Lostwithiel than elsewhere: 11.5% of scheduled stops, against 5.9% across its network and 6.5% for every operator at the station.

Alongside CrossCountry, the other operators at Lostwithiel are Great Western Railway (69.8%, 95% of stops), so passengers here can compare several services.

Period by period

40%60%80%2023-242024-252025-262026-27Period 3 of 2025-26: 51.4%Period 4 of 2025-26: 58.7%Period 5 of 2025-26: 44.8%Period 6 of 2025-26: 52.9%Period 7 of 2025-26: 74.0%Period 8 of 2025-26: 65.8%Period 9 of 2025-26: 64.2%Period 10 of 2025-26: 51.9%Period 11 of 2025-26: 55.2%Period 12 of 2025-26: 75.7%Period 13 of 2025-26: 71.2%Period 1 of 2026-27: 55.7%Period 2 of 2026-27: 44.6%Period 4 of 2026-27: 34.8%Period 5 of 2026-27: 32.7%Period 6 of 2026-27: 50.0%Period 7 of 2026-27: 66.0%
This pageGreat Britain
0%5%10%15%20%Period 3 of 2025-26: 12.5%Period 4 of 2025-26: 6.3%Period 5 of 2025-26: 16.3%Period 6 of 2025-26: 6.7%Period 7 of 2025-26: 3.8%Period 8 of 2025-26: 6.4%Period 9 of 2025-26: 14.5%Period 10 of 2025-26: 18.8%Period 11 of 2025-26: 19.4%Period 12 of 2025-26: 2.8%Period 13 of 2025-26: 7.6%Period 1 of 2026-27: 4.8%Period 2 of 2026-27: 12.5%Period 4 of 2026-27: 17.9%Period 5 of 2026-27: 12.5%Period 6 of 2026-27: 10.7%Period 7 of 2026-27: 16.1%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275666.0%16.1%
Period 6 of 2026-275650.0%10.7%
Period 5 of 2026-275632.7%12.5%
Period 4 of 2026-275634.8%17.9%
Period 3 of 2026-2750––
Period 2 of 2026-276444.6%12.5%
Period 1 of 2026-278355.7%4.8%
Period 13 of 2025-267971.2%7.6%
Period 12 of 2025-267275.7%2.8%
Period 11 of 2025-267255.2%19.4%
Period 10 of 2025-266451.9%18.8%
Period 9 of 2025-266264.2%14.5%
Period 8 of 2025-267865.8%6.4%

Other operators at Lostwithiel

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway15,55569.8%6.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out