Northern at Longbeck
How this operator is doing here
Northern had 22,353 scheduled stops at Longbeck in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 88.7% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
Northern trains at Longbeck also serve Marske (0.8 km east, 91.0% on time, 3.7% cancelled), Redcar East (2.6 km north-west, 90.0% on time, 3.7% cancelled), Saltburn (3.7 km east, 90.5% on time, 3.7% cancelled), Redcar Central (3.9 km north-west, 88.1% on time, 2.9% cancelled), South Bank (9.4 km west, 94.5% on time, 2.1% cancelled) and Nunthorpe (11.2 km south-west, 85.7% on time, 3.0% cancelled), which are the stations on its network closest to Longbeck.
Within 30 km of here, Northern runs best at South Bank, 9.4 km west (94.5%), and worst at Horden, 26.3 km north-west (76.3%).
The busiest Northern station within 30 km of Longbeck is Middlesbrough, 13.2 km west, with about 134 scheduled stops a day.
Of the 1 operators with enough records at Longbeck, Northern is the most punctual, at 88.7%.
For Northern, Longbeck is the 48th best of 493 ranked stations. Its 88.7% here is 10.1 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Longbeck has got worse each time, from 89.5% within three minutes in 2023-24 to 88.7% in 2024-25 and 87.6% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,661 | 89.2% | 2.6% |
| Period 6 of 2026-27 | 1,728 | 89.7% | 4.6% |
| Period 5 of 2026-27 | 1,728 | 86.1% | 3.4% |
| Period 4 of 2026-27 | 1,725 | 89.8% | 3.2% |
| Period 3 of 2026-27 | 1,728 | 94.2% | 5.9% |
| Period 2 of 2026-27 | 1,719 | 87.7% | 2.1% |
| Period 1 of 2026-27 | 1,996 | – | 2.0% |
| Period 13 of 2025-26 | 1,659 | 88.7% | 4.1% |
| Period 12 of 2025-26 | 1,728 | 91.0% | 1.7% |
| Period 11 of 2025-26 | 1,728 | 90.0% | 4.1% |
| Period 10 of 2025-26 | 1,502 | 87.1% | 7.5% |
| Period 9 of 2025-26 | 1,724 | 85.6% | 4.1% |
| Period 8 of 2025-26 | 1,727 | 85.5% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out