Llwyngwril
LLWWalesManaged by TfW Rail
How this station is performing
Llwyngwril has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,356 scheduled stops, about 15 a day. In those periods 70.3% of stops arrived within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Llwyngwril opened on 24 October 1863, 163 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Llwyngwril is the oldest; the next oldest, Fairbourne, dates from 1865.
The nearest stations to Llwyngwril are Fairbourne (4.2 km north-east), Morfa Mawddach (5.9 km north-east), Tonfanau (6.4 km south), Barmouth (6.6 km north) and Llanaber (8.4 km north). 6 stations lie within 10 km in all. At 70.3%, Llwyngwril is less punctual than all of them; the best of the five, Barmouth, manages 81.9%.
Llwyngwril takes its name from a Village called Llwyngwril, home to about 526 people, and the station stands 0.3 km from its centre.
For Llwyngwril, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 43.4% of stops arrived within three minutes of the timetable. The strongest was Period 9 of 2023-24, at 86.6%, which is 43.2 percentage points higher.
Compared with 3 stations of a similar size in Wales, Llwyngwril is the least punctual, at 70.3%. All of them are ahead, including Dyffryn Ardudwy (80.4%), Fairbourne (80.7%) and Harlech (82.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,356 | 70.3% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Llwyngwril? Delay Repay
These operators call at Llwyngwril and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 73.9% | 0.9% |
| Period 6 of 2026-27 | 430 | 56.3% | 1.4% |
| Period 5 of 2026-27 | 427 | 43.4% | 3.0% |
| Period 4 of 2026-27 | 426 | – | 2.3% |
| Period 3 of 2026-27 | 424 | 63.6% | 3.3% |
| Period 2 of 2026-27 | 357 | 66.3% | 0.0% |
| Period 1 of 2026-27 | 487 | 72.4% | 1.0% |
| Period 13 of 2025-26 | 466 | 75.2% | 0.2% |
| Period 12 of 2025-26 | 288 | 84.0% | 0.3% |
| Period 11 of 2025-26 | 392 | 84.8% | 1.3% |
| Period 10 of 2025-26 | 387 | 78.4% | 2.3% |
| Period 9 of 2025-26 | 424 | 78.3% | 1.2% |
| Period 8 of 2025-26 | 424 | 66.3% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dyffryn Ardudwy | 5,356 | 80.4% | 1.4% |
| Fairbourne | 5,356 | 80.7% | 1.4% |
| Harlech | 5,356 | 82.1% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out