Llandudno
LLDWalesManaged by TfW Rail
How this station is performing
Llandudno had 20,039 scheduled stops to Period 7 of 2026-27, about 55 a day. 89.6% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Llandudno opened on 1 October 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Conwy is the oldest (1848) and Deganwy the newest (1866), with Llandudno in between.
The nearest stations to Llandudno are Deganwy (2.9 km south), Llandudno Junction (4.2 km south), Conwy (4.5 km south), Glan Conwy (6.1 km south) and Colwyn Bay (7.3 km east). 6 stations lie within 10 km in all. At 89.6%, Llandudno is more punctual than every one of them; the best of the five, Deganwy, manages 89.0%.
In Wales, Llandudno ranks 59th of 185 ranked stations. Its 89.6% is 8.6 percentage points better than the area median of 81.0%.
Across the whole run of data, the weakest four-week period for Llandudno was Period 4 of 2023-24, at 83.5%, some time before the latest year. The strongest was Period 13 of 2024-25, at 95.2%, and the two are 11.7 percentage points apart. Cancellations peaked at 7.1% of scheduled stops in Period 9 of 2024-25, against 2.9% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Llandudno is the most punctual, at 89.6%. The comparison group includes Holyhead (78.9%), Ebbw Vale Town (88.8%) and Crosskeys (86.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,039 | 89.6% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Llandudno? Delay Repay
These operators call at Llandudno and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,716 | 89.7% | 1.2% |
| Period 6 of 2026-27 | 1,716 | 86.8% | 3.6% |
| Period 5 of 2026-27 | 1,645 | 83.5% | 1.8% |
| Period 4 of 2026-27 | 1,662 | 89.0% | 4.2% |
| Period 3 of 2026-27 | 1,638 | 88.8% | 3.7% |
| Period 2 of 2026-27 | 1,574 | 88.0% | 3.2% |
| Period 1 of 2026-27 | 1,654 | 90.3% | 1.7% |
| Period 13 of 2025-26 | 1,568 | 93.8% | 5.7% |
| Period 12 of 2025-26 | 1,432 | 94.9% | 2.0% |
| Period 11 of 2025-26 | 1,351 | 94.5% | 3.0% |
| Period 10 of 2025-26 | 1,272 | 91.8% | 2.4% |
| Period 9 of 2025-26 | 1,367 | 86.9% | 4.1% |
| Period 8 of 2025-26 | 1,444 | 88.6% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Holyhead | 20,042 | 78.9% | 2.6% |
| Ebbw Vale Town | 20,055 | 88.8% | 4.9% |
| Crosskeys | 20,016 | 86.9% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out