East Midlands Railway at Liverpool South Parkway
All trains at Liverpool South ParkwayEast Midlands Railway across BritainNorth West
How this operator is doing here
East Midlands Railway had 9,533 scheduled stops at Liverpool South Parkway in the 13 periods to Period 7 of 2026-27, 7% of the station's total. 61.0% of recorded arrivals came within three minutes and 6.3% of stops were cancelled.
East Midlands Railway trains at Liverpool South Parkway also serve Hunts Cross (2.3 km east, – on time, – cancelled), Hough Green (7.8 km east, – on time, – cancelled), Liverpool Lime Street (8.0 km north-west, 60.3% on time, 5.0% cancelled), Widnes (10.6 km east, 59.8% on time, 6.5% cancelled), Warrington Central (20.1 km east, 62.0% on time, 6.5% cancelled) and Birchwood (24.9 km east, 68.6% on time, 6.9% cancelled), which are the stations on its network closest to Liverpool South Parkway.
Within 30 km of here, East Midlands Railway runs best at Warrington Central, 20.1 km east (62.0%), and worst at Widnes, 10.6 km east (59.8%).
The busiest East Midlands Railway station within 30 km of Liverpool South Parkway is Warrington Central, 20.1 km east, with about 26 scheduled stops a day.
East Midlands Railway at Liverpool South Parkway has slipped sharply. 61.0% of stops came within three minutes of the timetable in the latest 13 periods, 7.7 percentage points worse than the 68.7% recorded in the 13 before. Cancellations rose to 6.3% of scheduled stops from 5.3%, which is 1.0 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 767 | 58.6% | 4.0% |
| Period 6 of 2026-27 | 768 | 59.8% | 7.4% |
| Period 5 of 2026-27 | 710 | 59.2% | 10.1% |
| Period 4 of 2026-27 | 689 | 58.9% | 6.5% |
| Period 3 of 2026-27 | 768 | 58.3% | 10.2% |
| Period 2 of 2026-27 | 744 | 56.5% | 7.1% |
| Period 1 of 2026-27 | 884 | 64.0% | 8.6% |
| Period 13 of 2025-26 | 728 | 63.5% | 3.8% |
| Period 12 of 2025-26 | 531 | 67.9% | 2.6% |
| Period 11 of 2025-26 | 727 | 65.8% | 4.0% |
| Period 10 of 2025-26 | 702 | 62.9% | 9.1% |
| Period 9 of 2025-26 | 751 | 57.6% | 4.9% |
| Period 8 of 2025-26 | 764 | 61.7% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Liverpool South Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 43,235 | 92.3% | 2.1% |
| Northern | 22,822 | 70.7% | 3.4% |
| West Midlands Railway | 20,994 | 71.5% | 5.1% |
| TransPennine Express | 12,622 | 68.3% | 7.6% |
| Transport for Wales | 11,818 | 81.4% | 2.9% |
| Avanti | 6,779 | 66.0% | 6.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out