Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Avanti at Liverpool South Parkway

All trains at Liverpool South ParkwayAvanti across BritainNorth West

On time, last 13 periods66.0%Whole station: 78.1%
Cancelled6.9%Whole station: 4.0%
Scheduled stops6,779Of 127,803 at the station

How this operator is doing here

Avanti had 6,779 scheduled stops at Liverpool South Parkway in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 66.0% of recorded arrivals came within three minutes and 6.9% of stops were cancelled.

Avanti trains at Liverpool South Parkway also serve Liverpool Lime Street (8.0 km north-west, 64.9% on time, 5.8% cancelled), Runcorn (10.2 km east, 67.9% on time, 6.0% cancelled), Rainhill (10.5 km north-east, – on time, – cancelled), Chester (17.9 km south, 65.3% on time, 6.9% cancelled), Warrington Bank Quay (19.3 km east, 45.4% on time, 3.9% cancelled) and Flint (20.2 km south-west, 67.5% on time, 2.9% cancelled), which are the stations on its network closest to Liverpool South Parkway.

Within 30 km of here, Avanti runs best at Runcorn, 10.2 km east (67.9%), and worst at Warrington Bank Quay, 19.3 km east (45.4%).

The busiest Avanti station within 30 km of Liverpool South Parkway is Warrington Bank Quay, 19.3 km east, with about 61 scheduled stops a day.

Avanti ranks 6th of the 7 operators with enough records at Liverpool South Parkway, on 66.0%.

For Avanti, Liverpool South Parkway is the 11th best of 42 ranked stations. Its 66.0% here is 10.8 percentage points above the 55.2% across the whole network.

Period by period

50%60%70%80%90%2023-242024-252025-262026-27Period 10 of 2025-26: 62.8%Period 11 of 2025-26: 58.9%Period 12 of 2025-26: 72.5%Period 13 of 2025-26: 71.5%Period 1 of 2026-27: 75.3%Period 2 of 2026-27: 65.1%Period 3 of 2026-27: 67.3%Period 4 of 2026-27: 54.6%Period 5 of 2026-27: 61.2%Period 6 of 2026-27: 62.2%Period 7 of 2026-27: 69.9%
This pageGreat Britain
0%5%10%15%20%Period 10 of 2025-26: 4.9%Period 11 of 2025-26: 10.8%Period 12 of 2025-26: 4.4%Period 13 of 2025-26: 5.6%Period 1 of 2026-27: 6.0%Period 2 of 2026-27: 7.7%Period 3 of 2026-27: 3.0%Period 4 of 2026-27: 17.1%Period 5 of 2026-27: 11.3%Period 6 of 2026-27: 2.6%Period 7 of 2026-27: 1.3%2023-242024-252025-262026-27

See how Avanti Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2763269.9%1.3%
Period 6 of 2026-2768462.2%2.6%
Period 5 of 2026-2768261.2%11.3%
Period 4 of 2026-2763254.6%17.1%
Period 3 of 2026-2759667.3%3.0%
Period 2 of 2026-2763665.1%7.7%
Period 1 of 2026-2763875.3%6.0%
Period 13 of 2025-2673371.5%5.6%
Period 12 of 2025-2668472.5%4.4%
Period 11 of 2025-2661958.9%10.8%
Period 10 of 2025-2624362.8%4.9%
Period 9 of 2025-260––
Period 8 of 2025-260––

Other operators at Liverpool South Parkway

OperatorScheduled stopsWithin 3 minCancelled
Merseyrail43,23592.3%2.1%
Northern22,82270.7%3.4%
West Midlands Railway20,99471.5%5.1%
TransPennine Express12,62268.3%7.6%
Transport for Wales11,81881.4%2.9%
East Midlands Railway9,53361.0%6.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out