GTR at Littleport
How this operator is doing here
GTR had 17,147 scheduled stops at Littleport in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 65.2% of recorded arrivals came within three minutes and 9.9% of stops were cancelled.
GTR trains at Littleport also serve Ely (8.6 km south-west, 66.9% on time, 10.7% cancelled), Downham Market (16.1 km north, 64.2% on time, 10.0% cancelled), Waterbeach (23.6 km south, 68.1% on time, 10.5% cancelled), Watlington (23.8 km north, 62.7% on time, 10.0% cancelled), Cambridge North (28.5 km south, 68.9% on time, 10.2% cancelled) and Cambridge (32.2 km south, 68.5% on time, 8.4% cancelled), which are the stations on its network closest to Littleport.
Within 30 km of here, GTR runs best at Cambridge North, 28.5 km south (68.9%), and worst at Watlington, 23.8 km north (62.7%).
The busiest GTR station within 30 km of Littleport is Cambridge North, 28.5 km south, with about 67 scheduled stops a day.
GTR at Littleport has slipped sharply. 65.2% of stops came within three minutes of the timetable in the latest 13 periods, 9.9 percentage points worse than the 75.1% recorded in the 13 before. Cancellations rose to 9.9% of scheduled stops from 6.6%, which is 3.3 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,257 | 44.1% | 8.2% |
| Period 6 of 2026-27 | 1,411 | 53.2% | 24.0% |
| Period 5 of 2026-27 | 1,301 | 61.4% | 14.5% |
| Period 4 of 2026-27 | 1,392 | 50.7% | 17.2% |
| Period 3 of 2026-27 | 1,295 | 67.0% | 9.5% |
| Period 2 of 2026-27 | 1,176 | 63.4% | 9.9% |
| Period 1 of 2026-27 | 1,326 | 70.0% | 7.2% |
| Period 13 of 2025-26 | 1,518 | 70.7% | 7.1% |
| Period 12 of 2025-26 | 1,419 | 72.4% | 6.0% |
| Period 11 of 2025-26 | 1,416 | 66.1% | 6.6% |
| Period 10 of 2025-26 | 1,178 | 74.7% | 4.8% |
| Period 9 of 2025-26 | 1,358 | 76.5% | 7.7% |
| Period 8 of 2025-26 | 1,100 | 73.3% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out