How this station is performing
Little Sutton has usable figures for 8 of the last 13 four-week periods to Period 7 of 2026-27, covering 25,904 scheduled stops, about 71 a day. In those periods 83.2% of stops arrived within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Little Sutton opened on 1 July 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hooton is the oldest (1840) and Eastham Rake the newest (1995), with Little Sutton in between.
The nearest stations to Little Sutton are Overpool (1.2 km east), Hooton (2.6 km north-west), Capenhurst (2.8 km south), Ellesmere Port (3.2 km east) and Eastham Rake (3.5 km north-west). 20 stations lie within 10 km in all. At 83.2%, Little Sutton is less punctual than all of them; the best of the five, Overpool, manages 97.9%.
Little Sutton is one of 3 stations named after a Village called Little Sutton; this one stands 0.2 km from its centre.
For Little Sutton, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 75.6% of stops arrived within three minutes of the timetable. The strongest was Period 7 of 2026-27, at 92.8%, which is 17.2 percentage points higher. Cancellations peaked at 9.1% of scheduled stops in Period 11 of 2024-25, against 1.8% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 25,904 | 83.2% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Little Sutton? Delay Repay
These operators call at Little Sutton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,960 | 92.8% | 1.4% |
| Period 6 of 2026-27 | 1,980 | – | 3.2% |
| Period 5 of 2026-27 | 1,980 | 85.6% | 1.7% |
| Period 4 of 2026-27 | 1,843 | 75.6% | 1.0% |
| Period 3 of 2026-27 | 1,980 | – | 1.8% |
| Period 2 of 2026-27 | 1,980 | – | 0.6% |
| Period 1 of 2026-27 | 2,265 | – | 0.5% |
| Period 13 of 2025-26 | 2,186 | 81.9% | 1.2% |
| Period 12 of 2025-26 | 1,980 | – | 1.6% |
| Period 11 of 2025-26 | 1,980 | 79.0% | 4.6% |
| Period 10 of 2025-26 | 1,787 | 83.3% | 1.5% |
| Period 9 of 2025-26 | 1,959 | 81.1% | 1.7% |
| Period 8 of 2025-26 | 2,024 | 85.6% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out