GTR had 25,182 scheduled stops at Leatherhead in the 13 periods to Period 7 of 2026-27, 47% of the station's total. 89.7% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
GTR trains at Leatherhead also serve Ashtead (2.7 km north-east, 91.2% on time, 2.5% cancelled), Box Hill and Westhumble (5.0 km south, 92.0% on time, 2.8% cancelled), Epsom (Surrey) (5.9 km north-east, 90.8% on time, 2.6% cancelled), Tattenham Corner (6.4 km east, 84.5% on time, 2.6% cancelled), Dorking (Main) (6.5 km south, 89.1% on time, 2.5% cancelled) and Tadworth (6.8 km east, 85.9% on time, 2.9% cancelled), which are the stations on its network closest to Leatherhead.
Within 30 km of here, GTR runs best at Birkbeck, 22.5 km north-east (98.1%), and worst at Kenley, 16.4 km east (66.9%).
The busiest GTR station within 30 km of Leatherhead is East Croydon, 18.7 km north-east, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Leatherhead, GTR is the most punctual, at 89.7%.
GTR at Leatherhead has slipped a little, from 92.3% within three minutes in the previous 13 periods to 89.7% in the latest 13, a fall of 2.6 percentage points. Cancellations rose to 2.5% of scheduled stops from 1.5%, which is 1.0 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,945 | 89.4% | 6.0% |
| Period 6 of 2026-27 | 1,930 | 90.1% | 1.0% |
| Period 5 of 2026-27 | 1,881 | 89.0% | 3.1% |
| Period 4 of 2026-27 | 1,946 | 92.3% | 1.5% |
| Period 3 of 2026-27 | 1,927 | 89.2% | 2.4% |
| Period 2 of 2026-27 | 1,941 | 89.6% | 1.2% |
| Period 1 of 2026-27 | 2,163 | 90.2% | 0.6% |
| Period 13 of 2025-26 | 2,067 | 90.9% | 6.6% |
| Period 12 of 2025-26 | 1,872 | 88.6% | 0.7% |
| Period 11 of 2025-26 | 1,912 | 87.7% | 1.5% |
| Period 10 of 2025-26 | 1,764 | 90.2% | 1.8% |
| Period 9 of 2025-26 | 1,882 | 88.4% | 3.0% |
| Period 8 of 2025-26 | 1,952 | 90.4% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Leatherhead
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 28,044 | 81.4% | 3.6% |