Leasowe has usable figures for 2 of the last 13 four-week periods to Period 7 of 2026-27, covering 40,403 scheduled stops, about 111 a day. In those periods 72.4% of stops arrived within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Leasowe opened on 4 July 1870 and closed to passengers on 1 August 1872. It reopened on 5 May 1894, 132 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Moreton (Merseyside) is the oldest (1866) and Wallasey Village the newest (1907), with Leasowe in between.
The nearest stations to Leasowe are Moreton (Merseyside) (0.9 km west), Bidston (1.4 km east), Upton (Merseyside) (2.6 km south-east), Wallasey Village (2.6 km north-east) and Birkenhead North (2.8 km east). 33 stations lie within 10 km in all. At 72.4%, Leasowe is less punctual than all of them; the best of the five, Birkenhead North, manages 91.6%.
Leasowe takes its name from a suburb called Leasowe, home to about 6,180 people, and the station stands 0.7 km from its centre.
For Leasowe, the weakest four-week period in the data is a recent one: Period 10 of 2025-26, when only 70.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 92.1%, which is 21.9 percentage points higher. Cancellations peaked at 5.1% of scheduled stops in Period 11 of 2024-25, against 1.7% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 40,403 | 72.4% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Leasowe? Delay Repay
These operators call at Leasowe and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,084 | – | 1.2% |
| Period 6 of 2026-27 | 3,084 | – | 2.5% |
| Period 5 of 2026-27 | 3,084 | – | 2.7% |
| Period 4 of 2026-27 | 2,903 | – | 1.7% |
| Period 3 of 2026-27 | 3,084 | – | 1.8% |
| Period 2 of 2026-27 | 3,084 | – | 1.2% |
| Period 1 of 2026-27 | 3,556 | – | 1.6% |
| Period 13 of 2025-26 | 3,384 | – | 0.8% |
| Period 12 of 2025-26 | 3,084 | – | 2.6% |
| Period 11 of 2025-26 | 3,084 | – | 1.1% |
| Period 10 of 2025-26 | 2,797 | 70.2% | 1.3% |
| Period 9 of 2025-26 | 3,083 | – | 2.5% |
| Period 8 of 2025-26 | 3,092 | 74.4% | 1.8% |