CrossCountry at Leamington Spa
All trains at Leamington SpaCrossCountry across BritainWest Midlands
How this operator is doing here
CrossCountry had 16,921 scheduled stops at Leamington Spa in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 56.8% of recorded arrivals came within three minutes and 5.1% of stops were cancelled.
CrossCountry trains at Leamington Spa also serve Coventry (13.0 km north, 54.6% on time, 4.8% cancelled), Dorridge (17.7 km north-west, – on time, – cancelled), Birmingham International (22.5 km north-west, 52.1% on time, 4.8% cancelled), Nuneaton (27.4 km north, 64.1% on time, 3.2% cancelled), Coleshill Parkway (28.3 km north-west, 66.2% on time, 3.3% cancelled) and Banbury (28.6 km south-east, 53.1% on time, 5.0% cancelled), which are the stations on its network closest to Leamington Spa.
Within 30 km of here, CrossCountry runs best at Coleshill Parkway, 28.3 km north-west (66.2%), and worst at Birmingham International, 22.5 km north-west (52.1%).
The busiest CrossCountry station within 30 km of Leamington Spa is Coleshill Parkway, 28.3 km north-west, with about 64 scheduled stops a day.
CrossCountry at Leamington Spa has slipped sharply. 56.8% of stops came within three minutes of the timetable in the latest 13 periods, 7.0 percentage points worse than the 63.8% recorded in the 13 before. Cancellations rose to 5.1% of scheduled stops from 4.3%, which is 0.8 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,404 | 48.0% | 6.0% |
| Period 6 of 2026-27 | 1,422 | 46.5% | 6.8% |
| Period 5 of 2026-27 | 1,402 | 50.8% | 5.3% |
| Period 4 of 2026-27 | 1,398 | 46.6% | 5.7% |
| Period 3 of 2026-27 | 1,328 | 56.2% | 5.5% |
| Period 2 of 2026-27 | 1,308 | 57.5% | 7.8% |
| Period 1 of 2026-27 | 1,460 | 63.9% | 2.4% |
| Period 13 of 2025-26 | 1,378 | 67.7% | 2.8% |
| Period 12 of 2025-26 | 1,182 | 74.8% | 4.7% |
| Period 11 of 2025-26 | 1,271 | 67.1% | 4.4% |
| Period 10 of 2025-26 | 1,099 | 61.0% | 7.9% |
| Period 9 of 2025-26 | 1,155 | 47.2% | 4.5% |
| Period 8 of 2025-26 | 1,114 | 51.9% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Leamington Spa
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 29,603 | 83.1% | 1.2% |
| West Midlands Railway | 14,009 | 84.3% | 5.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out